My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
3500 - Local Oversight Program
>
PR0544792
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 11:50:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544792
PE
3528
FACILITY_ID
FA0004849
FACILITY_NAME
BILLS BAIT & BEACON GAS
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
515 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 16) , and California policies and procedures for <br /> investigation of cleanup and abatement of discharge under Water <br /> Code Section 13304 (June 1992) . <br /> TASK # 1 WORK PLAN AND PERMITS <br /> A- The property adjacent to the site on the north side needs to <br /> have a test well located on it. We have not gained permission <br /> yet. Contractor must address this problem. The State Regional <br /> Water Department and DEH will help. I also will work on this. <br /> B- Conduct a site background investigation to obtain the <br /> information necessary to carry out the field work and to prepare <br /> the site background section of the report described in Task 5. <br /> C- Prepare .a health and safety (H & S) plan according to San <br /> Joaquin County guidelines for sampling and site investigation. <br /> D- Prepare project work plan and work schedule pursuant to the <br /> guidelines. < <br /> . .Z- Submit the H & S plan, work plan and schedule to DEH for <br /> review. <br /> TASK # 2 SOIL BORING AND MONITORING WELL <br /> INSTALLATION AND SAMPLING <br /> A- Drill the soil borings and install the monitoring wells <br /> requested in this IFB after the DEH has reviewed the site <br /> investigation work plan and found it acceptable. Future borings <br /> and/or wells will be dictated by the results of the SCWI and any <br /> DEH directives. <br /> B- Collect soil and ground water samples according to the DEH <br /> guidelines. <br /> TASK # 3 GROUND WATER MONITORING <br /> A- Monitor ground water of the site on a quarterly basis for <br /> petroleum hydrocarbons for one year and measure groundwater level <br /> for ground water gradient calculations on a monthly basis for one <br /> year. <br /> TASK # 4 LABORATORY ANALYSIS <br /> A- Deliver all soil and groundwater samples to an analytical <br /> laboratory licensed by the state of California for hazardous <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.