My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
595
>
3500 - Local Oversight Program
>
PR0544793
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 1:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544793
PE
3528
FACILITY_ID
FA0006237
FACILITY_NAME
HONEST AUTO SALE AND REPAIR
STREET_NUMBER
595
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337004
CURRENT_STATUS
02
SITE_LOCATION
595 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> for? <br /> All tenants have been advised that if needed (safety and health) they would be put up in local <br /> lodging, provided with meals (perdiem) and other out of pocket expenses. I do not <br /> anticipate more that one or two nights displacement for any tenant providing we dig and <br /> backfill like a trenching operation an as noted above. <br /> Please let me know of a good time to discuss contaminated soil and water management with you! <br /> I am projecting 300 tons/15 truck loads for disposal and moving 1100 tons to get at the 300 tons. <br /> There is not much room to stockpile stinky dirt or clean dirt on site. I would prefer for tenant <br /> safety, owner, and RP liability to stockpile contaminated soil at one of two locations. First choice <br /> is a stockpile agreement at Forward landfill. Second choice is just east of the site on the former <br /> Heinz property. The proposed location is just across the tracks from the site within the fence <br /> area. At either location the soil would be wrapped in plastic and sampled and characterized for <br /> proper disposal. Both locations will satisfy the concern for Tenant exposure and safety and <br /> li support access to tenants, fire and life safety by avoiding huge piles of dirt on site. These are the <br /> basics for soil management that I would like to discuss with you and then provide any additional <br /> information you may request. <br /> I can squeeze the water storage tank somewhere at the site (car lot in the front or along RR tracks <br /> behind building) but would prefer putting it across the tracks in a fence in yard away from any <br /> possible derailment. a <br /> v ideas that the final conditions for the work will be provided <br /> I suppose after we discuss the above <br /> by EHD. I look forward to working out the details with you. <br /> I am considering starting the work in early December or January with your approval and once we <br /> finalize minor soil and water management issues. Additionally,the work will start after our <br /> contract is finalized with each of the Cox and Cox Partners. I look forward to hearing from you. <br /> I <br /> Thank you, John Lynch <br /> i <br /> I <br />{ i <br /> I <br /> II <br /> I <br /> F <br /> 11/12/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.