Laserfiche WebLink
Cox & Cox page 2 I <br /> 595 11th Street, Tracy <br /> Interim Remedial Action Work Plan , <br /> i <br /> COMMENTS AND CONDITIONS (continued): <br /> Please provide EHD with an Executive Summary so the site may be <br /> posted. The Executive Summary is a one-paged document designed <br /> to notify the public of the past, current, and future use of the site. <br /> The summary should be written in non-technical language for ease <br /> of understanding. Included should be a brief description of, a) the <br /> history of the site up to now, b) what you want to do, c) how long it <br /> will take, and d) what the site will be after your procedure has been <br /> completed. Typical comment periods are 7-10 days. <br /> After the Executive Summary is received and approved, EHD will <br /> post the site, answer any questions from the public, and inform you <br /> when the Public Comment Period has been completed. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN fH&S 25299.37, <br /> subd(c)(3)1: <br /> Monitoring well destruction method and materials proposed are to <br /> be modified as noted in "comments and condnio s <br /> DATED: October 17, 2003 BY: 67 <br /> Michael Infurna, Sen- REHS (209) 468-3454 <br /> c: Earl Breitstein, 507 E. 11th St., Tracy. CA., 95376. <br /> c: Dennis M. Cox, 22862 N. Tuolumne Rd, Twain Harte, CA. 95383 j <br /> c: Gary L. Cox— 2931 Via Ipanema, Carlsbad, CA. 92009 <br /> [X] Faxed to consultant on: <br /> I <br />