My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012766
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2600 - Land Use Program
>
EIR-96-1
>
SU0012766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:04:32 PM
Creation date
9/4/2019 9:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012766
PE
2677
FACILITY_NAME
EIR-96-1
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-
APN
17726012
ENTERED_DATE
1/2/2020 12:00:00 AM
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\EIR-96-01\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Impact T-L• Increased Traffic at Roadways, Freeway Ramps, and Intersections Resulting <br /> from Project (Phase 1 Interchange) Conditions <br /> Under 2015 proposed project conditions with Phase 1 interchange improvements, traffic in <br /> the project area will increase. However, based on trip generation for assumed land uses and planned <br /> # intersection, interchange, and roadway improvements, roadways and intersections in the project area <br /> are expected to operate at LOS D or better. This impact is, therefore, considered less than <br /> significant. <br /> Although this impact is considered less than significant, the following mitigation measure <br /> is recommended to ensure that traffic operating conditions remain at LOS D or better as the project <br /> site is developed. <br /> Et <br /> ' <br /> Mitigation Measure T-1: Evaluate and Monitor Traffic Operating Conditions at Critical <br /> Roadways and Intersections and Implement Measures to Ensure that Operating Conditions <br /> iRemain at LOS D or Better <br /> Before each phase of development on the project site, the Department of Aviation in <br /> coordination with the Department of Public Works shall evaluate and monitor traffic operating <br /> conditions at the critical roadways and intersections identified in the traffic study. If is it determined <br /> that traffic operating conditions would not remain at LOS D or better with implementation of the <br /> planned development or if actual traffic operating conditions are not at LOS D or better, planned <br /> roadway and intersection improvement measurements shall be implemented before approval of <br /> ►� additional development on the project site to ensure that operating conditions remain at LOS D or <br /> better. Planned improvements include measures such as the addition of turning lanes at intersections <br /> and the addition of lanes to roadways. Before each phase of development on the project site, the <br /> County shall coordinate with the City of Stockton and Caltrans on the evaluation and monitoring <br /> 4 { of traffic operating conditions on critical roadways and interchanges. <br /> l <br /> .� 2015 PROPOSED PROJECT WITH PHASE 2 INTERCHANGE IMPROVEMENTS <br /> A summary of key data and assumptions for the proposed project with Phase 2 interchange <br /> E � <br /> improvements (i.e., with flyover ramps) at the Arch-Airport/SR 99 interchange is shown in <br /> Table 34. Planned roadway and intersection improvements assumed in the analysis are described <br /> in detail in the traffic study (KASL Consulting Engineers 1998). Intersection improvements <br /> " described above for Phase 1 interchange conditions (Table 7-4) apply to this condition with the <br /> exception that a single northbound right-turn lane would be needed at the intersection of Qantas and <br /> Arch-Airport Road instead of dual right-turn lanes. Roadway improvements are the same as those <br /> described above for Phase 1 conditions. <br /> , <br /> Stockton Metropolilan Airport Project Chapter T Transportation and Circulation <br /> Draft Environmental Impact Report March 20, 1998 <br /> 7-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.