My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012766
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2600 - Land Use Program
>
EIR-96-1
>
SU0012766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:04:32 PM
Creation date
9/4/2019 9:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012766
PE
2677
FACILITY_NAME
EIR-96-1
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-
APN
17726012
ENTERED_DATE
1/2/2020 12:00:00 AM
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\EIR-96-01\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on the Airport Layout Plan and the General Plan Amendment for land use on the <br /> airport, the projected land uses are summarized in Table No. 8-2 in the form of acres of <br /> each type of development and numbers of enplaned passengers, visitors, and employees. <br /> XABL ::NM '00. <br /> ............... <br /> IS. <br /> % <br /> -D <br /> -1�:::USE: <br /> X0JECTEDAMOW., <br /> ........................ <br /> . . . .. . . . .. . . .. .... . . . . . ......... <br /> 2015; 2R]5 2RI <br /> ................... . <br /> ............ <br /> ' <br /> ............ <br /> .. . . .. .. Propose i�:�:Pronosed' <br /> IS. <br /> Reduced Land <br /> Use U- t" <br /> .rojec <br /> t P, t Cv61 ; Cumulative <br /> nulaiv—e: <br /> :Phasej 'Ph'" <br /> ase2 Alternatwe <br /> Interchaslge IT, Cliapgq: <br /> Commercial/Retail Acre 55 65 66 65 <br /> Industrial Officel Acre 60 75 12 95 <br /> Research Development <br /> Industrial Warehouse Acre 160 172 22 192 <br /> Air Metrb Industrial <br /> Park Acre 78 78 78 78 <br /> Farmington Fresh Acre 66 66 66 66 <br /> Employee (150) (150) (150) (150) <br /> Enplaned Passengers Million 2 2 1 <br /> Visitors Million 2 2 1 4 <br /> g 6 <br /> 5 0) <br /> 4 <br /> Airport Employees* Each 400 400 300 800 <br /> Hotel Room 300 300 300 400 <br /> Landscaping Acre 8 8 4 10 <br /> 'Airport and Airline Employees <br /> The 2015 Reduced Development Alternative, 2015 Proposed Project Phase I and Phase <br /> 2, and Cumulative Project provide for adjustments in the ratio of Commercial, Industrial <br /> Office, and Industrial Warehouse development allowed on the airport property in order <br /> to limit the traffic on airport and adjacent roads to acceptable levels of service (LOS). <br /> B. Domestic Water <br /> Domestic water for the airport was previously supplied by an airport system whereby the <br /> water.was obtained from three wells on the airport and stored in an elevated "tank. The <br /> domestic water supply has now been turned over to the City of Stockton.. They elevated <br /> water4ank has been removed and the water well capped. The two remainin&,-w-ells are <br /> currently looped in service with two existing wells north of Arch-Airpoift Road. <br /> 8-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.