Laserfiche WebLink
CHAPTER 12. DEVELOPMENT COST ESTIMATES <br /> Cost estimates have been prepared for the development work anticipated within the next five <br /> years at the Stockton Metropolitan Airport. A summary of costs of the critical development items <br /> is included in Table No. 12-1 and the locations of these projects are shown on the Sketch Map, <br /> " Figure 12-1. <br /> Improvements included in this analysis are limited to those related.to aviation facilities and do <br /> not include any commercial, industrial, or warehouse development. The aviation facility <br /> improvements will be made by the Department of Airports. All commercial, industrial or <br /> warehouse developments will be made by private enterprise. <br /> 1 <br /> I <br /> 12-1 <br /> s <br />