Laserfiche WebLink
t <br /> t PA <br /> Response to Comment 1-25. This discussion is provided in the DEIR on pages 5-7, 5-10, and 5-11. <br /> The potential impact of the project on flooding is identified as significant because of the inadequate . <br /> capacity in Mansville Ditch and Weber Slough. The potential impact of the project on the 100-year <br /> ' floodplain elevation is also identified as a significant impact. Mitigation Measures DW-I and <br /> DW-4,which involve preparation of a comprehensive drainage plan and implementation of measures <br /> to reduce excessive increases in the floodplain water-surface elevation and to prevent new <br /> construction from causing the floodplain water level from encroaching into the freeboard space <br /> required by FEMA regulations. No changes to the'DE1R are required. <br /> �i <br />!f �F <br /> h �f <br /> J <br /> I <br /> Stockton Metropolitan Airport Project <br /> P P 1 Section 1. Introduction <br /> Final EIR 1-7 <br /> July 10, 1998 <br />