My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012770 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALFALFA
>
5182
>
2600 - Land Use Program
>
SU-90-10
>
SU0012770 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:49:35 PM
Creation date
9/4/2019 9:48:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012770
PE
2611
FACILITY_NAME
SU-90-10
STREET_NUMBER
5182
Direction
N
STREET_NAME
ALFALFA
STREET_TYPE
ST
City
LINDEN
Zip
95236-
APN
09128049
ENTERED_DATE
1/2/2020 12:00:00 AM
SITE_LOCATION
5182 N ALFALFA ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\ALFALFA\5182\SU-90-10\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SU-90-10 <br /> C) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amounts of dust. <br /> D) The area disturbed by clearing , earth moving or <br /> excavation activities should be minimized at all times . <br /> E) Instead of disking for weed control thev <br /> de eloper <br /> should mow, thereby leaving the ground undisturbed and <br /> with a mulch covering . <br /> After clearing , grading , eartA moving , or excavation <br /> operations , during construction phase fugitive dust should <br /> be controlled using the following methods : <br /> A) All inactive portions of the construction site <br /> should be seeded and watered until grass growth is <br /> evident . <br /> B) All active portions of the site . shall be <br /> sufficiently watered to prevent excessive amounts of dust . <br /> At all times , fugitive dust emissions should be controlled <br /> using the following procedures : <br /> A) On-site vehicle speed shall be limited to 15 mph . <br /> B) All areas with vehicle traffic should be watered <br /> periodically for stabilization of dust emissions . <br /> C) Use of petroleum-based dust palliative shall meet <br /> the road oil requirements of San Joaquin County Rule <br /> 409 . 5 , Cutback Asphalt Paving Materials . <br /> D) Streets adjacent to the project site should be <br /> swept as needed to remove silt which may have accumulated <br /> from construction activities . <br /> At all times , ozone precursor emissions should be <br /> controlled using the following methods : <br /> A) Equipment engines should be maintained in good <br /> condition and in proper tune as per manufacturer' s <br /> specifications . <br /> B) During the smog season (May through October) , the <br /> construction period should be lengthened so as to minimize <br /> the number of vehicles and equipment operating at the same <br /> time . <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.