Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.A-26 • <br /> Forward Inc.Landfill 2018 Expansion Project <br /> The following procedures are proposed as part of the project: <br /> • Existing measures to discourage birds from the landfill will be continued. Surface area • <br /> of ponds will be limited to the extent feasible. • <br /> • The project sponsor will continue to monitor bird populations. If follow-up surveys • <br /> show an increase in bird populations, the project sponsor will increase mitigation • <br /> measures such as covering the fill areas as soon as possible and using noise-makers and <br /> other measures as necessary to discourage birds from the site, until bird population <br /> levels return to the level found in pre-project surveys. Use of noise-makers would be • <br /> limited to daylight hours. • <br /> • As required by California Code of Regulation Title 27,Section 20270(b), Airport Safety, • <br /> the owner or operators proposing to site new solid waste facility units and lateral • <br /> expansions within a five-mile radius of any airport runway end used by turbojet or • <br /> piston-type aircraft must notify the affected airport and the FAA. Forward notified the <br /> Stockton Metropolitan Airport and FAA by letter on July 6, 2018. (Basso, 2018a). <br /> • As required by California Code of Regulation Title 27,Section 20270(c), Airport Safety, <br /> the owner or operator must place the demonstration in the operating record that the site <br /> will not pose a bird hazard to aircraft, and notify the Department of Resources Recycling • <br /> and Recovery (CalRecycle)that it has been placed in the operating record. Forward • <br /> notified CalRecycle that the demonstration was placed in the operating record by letter <br /> on July 6, 2018. (Basso,2018d, 2018e). <br /> • The project sponsor shall comply with the requirements applicable to existing landfills <br /> contained in Federal Aviation Administration(FAA) Advisory Circulars 150/5200-33B, <br /> Hazardous Wildlife Attractants On or Near Airports, and 150/5200-34A, Construction or • <br /> Establishment of Landfills Near Public Airports. Requirements in Advisory Circular • <br /> 150/5200-33B applicable to the proposed project include notification of the FAA and <br /> airport, and a demonstration that the landfill is designed and operated so it does not <br /> pose a bird hazard to aircraft. Forward notified the Stockton Metropolitan Airport and <br /> FAA by letter on July 6, 2018. (Basso,2018a). The effectiveness of the gull control • <br /> program at the existing landfill in avoiding bird hazards to aircraft is discussed under • <br /> Surrounding and Nearby Land Uses, above, and the demonstration that the site will not <br /> pose a bird hazard to aircraft was placed in the operating record by letter on July 6, 2018. <br /> (Basso, 2018b). Advisory Circular 150/5200-34A applies only to establishment of new <br /> landfills near airports, and does not apply to the proposed project. . <br /> • In addition to the procedures proposed as part of the project identified above, the project <br /> sponsor will abide by any additional reasonable and feasible measures designated by . <br /> the Stockton Metropolitan Airport or the FAA to mitigate bird population impacts that <br /> could be caused by the proposed project. <br /> As discussed in Surrounding and Nearby Land Uses, above, a bird control program was <br /> instituted at the landfill during the winter of 2010-2011. Gulls are not present in the Stockton <br /> area during the summer period (May to late September), and gull control at the landfill is not <br /> required then,but migrating and wintering gulls return to major feeding areas, such as landfills, • <br />