Laserfiche WebLink
• Draft Supplemental Environmental Impact Report Page IV.B-18 <br /> • Forward Inc. Landfill 2018 Expansion Project <br /> Forward Landfill for the life of the existing permits (see Project Description for a full discussion <br /> of permitted development). Both cumulative scenarios are described below. <br /> Previously Approved Projects <br /> County staff identified three nearby projects to include in the Approved Projects inventory for <br /> the transportation analysis conducted by Republic ITS for the previous 2013 EIR. Trips <br /> generated by these three projects were added to existing traffic volumes to develop EPAP <br /> • conditions traffic volume estimates. After the 2013 EIR traffic study was prepared, one of the <br /> • approved projects identified in the 2013 EIR, the California Health Care Facility, was completed. <br /> (The California Health Care Facility is described in Setting, Surrounding and Nearby Land Uses <br /> of W.A. Land Use and Agricultural Resources.) The other two approved projects identified in <br /> • the 2013 EIR and not yet constructed are listed below. <br /> • Archtown Industrial Project, located at the southwest corner of Newcastle and Arch <br /> • Roads. <br /> • • Arch Road Industrial Project, located on the south side of Arch Road between Austin <br /> • and Newcastle Roads, west of the Northern California Re-Entry Facility. <br /> According San Joaquin County and City of Stockton Planning staff, there are two approved but <br /> not yet built projects that would likely add traffic to the study area. These two approved <br /> • projects are Norcal Logistic Center located north of Arch Road between Austin Road and <br /> • Newcastle Road, and Tidewater Crossing located west of SR 99 and south of the Stockton <br /> Airport. Norcal Logistic Center is primarily a warehousing and distribution facility, while <br /> Tidewater Crossing is a mixed-use project with residential, industrial, school, and other uses. <br /> • The previously approved Mariposa Lake Development located north of the Mariposa Road and <br /> • Austin Road intersection is not expected to be built in the foreseeable future, according to <br /> Stockton planning staff, and as such is not included in the short-term scenario. Table IV.B-10 <br /> shows the estimated trips generated from these two approved projects. <br /> Table IV.13-10: Approved "Project' Trip Generation Estimates <br /> • AM Peak PM Peak <br /> • Hour Trips Hour Trips <br /> Enter Exit Enter Exit <br /> Norcal Logistic Center 690 439 502 879 <br /> • Tidewater Crossing 1847 1514 1916 2481 <br /> • Archtwon Industrial 154 98 112 196 <br /> Arch Raod Industrial 136 87 98 175 <br /> • Note:TEe above trip estimates were obtained from the traffic studies prepared for the approved <br /> • projects. <br /> • <br />