Laserfiche WebLink
Forward Inc. Landfill Expansion Project MMRP <br /> • Gulls land at the active disposal area, begin to feed, and are able to feed for 10 <br /> minutes or more,on two or more occasions during a week. <br /> • Flocks of gulls begin loafing on other parts of the landfill and are not scared away by <br /> the control program within 30 minutes,on more than two occasions during a week. <br /> • Gulls begin to circle over the landfill, including adjacent creek areas, and are not <br /> removed by the falcons. If this behavior continues over a period of one week, then it <br /> indicates that the birds are likely getting food at the landfill. <br /> ' The above triggers do not specify a minimum number of gulls because if one or two gulls are <br /> present, they will soon attract other gulls and numbers will build up. Therefore, it is essential <br /> to deter the first gulls. <br /> In the event that the bird control measures proposed as part of the project, described above, in <br /> combination with the gull control program described in this mitigation measure, are found to <br /> be ineffective in reducing the numbers of flocking birds by the criteria described above,the <br /> project sponsor shall implement one or more of the following: <br /> 1. The falconry program shall be intensified to ensure that there are no gaps in coverage <br /> and that additional falcons are available for those days when it may be necessary to <br /> fly the falcons often. <br /> ' 2. The operator shall introduce a more comprehensive pyrotechnic-based control <br /> program to supplement the falconry program. Many landfills successfully control <br /> gulls using only a pyrotechnic-based program. The pyrotechnics program shall <br /> provide coverage when the falcons were not on site during the week and on <br /> weekends. The pyrotechnics program shall also cover areas remote from the active <br /> area to remove loafing gulls. <br /> 3. With the exception of removal of prey base for predatory birds and mammals,and <br /> actions involving special-status bird species,the operator shall implement the <br /> recommendations for vegetation,wildlife,and water management contained in Odell, <br /> ' Russel W., Senior Wildlife Biologist, U.S. Department of Agriculture, Animal and <br /> Plant Health Inspection Service, Wildlife Services California, Letter to John <br /> Funderburg, Principal Planner, San Joaquin County Community Development <br /> Department,August 29, 2011. <br /> The Conditions of Approval for the proposed project shall include the requirement that the <br /> project sponsor,prior to construction,file a Notice of Proposed Construction or Alteration <br /> (Form 7460-1)with the Federal Aviation Administration. Forward has already submitted this <br /> form (Lewis,2018). <br /> The project sponsor shall undertake regular, ongoing communication with Airport staff <br /> regarding the airports Wildlife Hazard Assessment and wildlife management program,to <br /> address changes in wildlife presence or behavior observed at the landfill. <br /> ' S. Proposed as Part of the Project: <br /> Aircraft warning lights will be installed at the landfill as and when required by the FAA. <br /> Page 5 <br />