My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Inc. Landfill Expansion Project MMRP ' <br /> As required by California Code of Regulation Title 27,Section 20270(b),Airport Safety,the <br /> owner or operators proposing to site new solid waste facility units and lateral expansions ' <br /> within a five-mile radius of any airport runway end used by turbojet or piston-type aircraft <br /> must notify the affected airport and the FAA.Forward notified the Stockton Metropolitan <br /> Airport and FAA by letter on July 6, 2018. (Basso,2018a, 2018b). <br /> As required by California Code of Regulation Title 27,Section 20270(c), Airport Safety,the <br /> owner or operator must place the demonstration in the operating record that the site will not <br /> cause a bird hazard to aircraft, and notify the Department of Resources Recycling and <br /> Recovery(CalRecycle)that it has been placed in the operating record. Forward notified <br /> CalRecycle that the demonstration was placed in the operating record by letter on July 6, <br /> 2018. (Basso,2018d,Basso,2018e). ' <br /> The use of highly reflective surface materials in constructing structures on the site will be <br /> prohibited. <br /> 6. (A.5)Identified in this SEIR: <br /> The project sponsor shall include downward shielding of new landfill lighting, and shall <br /> abide by any additional reasonable and feasible measures that are designated by the Federal <br /> Aviation Administration(FAA)and Stockton Metropolitan Airport to mitigate lighting <br /> impacts that could be caused by the proposed project,including reducing or eliminating <br /> lighting during foggy conditions and concurrently suspending operations that depend on the ' <br /> lighting. <br /> The Conditions of Approval for the proposed project shall include the requirement that the <br /> project sponsor,prior to construction,file a Notice of Proposed Construction or Alteration <br /> (Form 7460-1)with the Federal Aviation Administration. Forward has already filed this form <br /> for the proposed project(Lewis,pers. com,August 8,2018). This form shall be re-filed if <br /> there is any change to proposed landfill grade. <br /> B. TRANSPORTATION AND CIRCULATION <br /> 7. Identified in this SEIR(13.7). (Revises 2013 EIR Mitigation Measure B.7). <br /> Improvements to Intersection 11, Arch Road/Austin Road, Southbound: The project shall <br /> contribute its fair share to the addition of one lane to provide one left-turn lane,two thru <br /> lanes, and one right-turn lane,as detailed in the 2018 SEIR TIA, Figures 12 and 13. <br /> 8. Forward 2013(B.7): <br /> Gamp intefseetions efi five year-ipAef�vals until seeh fifne as the first phase Of deVe!Opffleflt ifl <br /> the Mai4posa Lakes development is eenst-nHeCted--And eeeupied. After-stieh time ffienitefing <br /> shall oeeuf on an al basis Monitoring r pelts shall be prepared by a Professional <br /> manual peak period Wming fnevemef4 eetmts with a summafy r-epeft showing k4er-seetie <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.