Laserfiche WebLink
Forward Inc. Landfill Expansion Project MMRP <br /> :ti a4ie at that into-seetion shall no l,,, ger be requ:,. d_(Superseded by 2018 SEIR <br /> Mitigation,above.). <br /> 9. Forward 2002(B.2) <br /> The project applicant shall contribute$3,768.84 toward the signal installation at Austin <br /> Road/Arch Road. The applicant shall contribute$4,69667 to the signal installation at the <br /> intersection of Austin Road/French Camp Road. <br /> 10. Forward 2002(B.6) <br /> The applicant shall contribute a fair share to the required addition of a second eastbound-to- <br /> southbound left turn lane to Austin Road that would be required to improve intersection <br /> ' operations to acceptable levels. The improvement includes the addition of a second <br /> eastbound-to-southbound left turn lane at the intersection of Mariposa Road/Austin Road. <br /> With the recommended improvement, the intersection would operate at LOS B with a VIC <br /> ratio of 0.686 during the PMpeak hour. <br /> C.NOISE <br /> 11. Proposed as Part of the Project: <br /> As recommended mitigation in the 2000 EIR and implemented by the applicant the <br /> landowner or tenant at 9690 Austin Road shall be provided with the option of requesting a <br /> sound wall or noise barrier to reduce noise exposure both in the front yard and within the <br /> home. Additional noise monitoring and measures will be undertaken to demonstrate <br /> compliance with Development Title Section 9-1025.9 Transportation Noise Sources in the <br /> event noise complaints are received. <br /> 12. (C.2)Identified in 2013 EIR and revised in this SEIR: <br /> (a)To reduce truck traffic noise impacts,the landfill operator shall annually notify truck <br /> drives with a flyer that encourages drivers to maintain a steady speed on surface roads leading <br /> to the landfill. Drivers should be instructed to eliminate unnecessary noise by staying within <br /> the speed limit and travelling at a steady speed,especially for trips during the morning peak <br /> hours. <br /> (b)For sections of Austin Road north of the landfill to Arch Road and south of the landfill to <br /> French Camp Road and Arch Road immediately west of Austin Road,residences within 100 <br /> feet of the centerline of Austin Road shall be provided with the option of requesting funds for <br /> installation of a sound barrier and/or additional insulation <br /> ' Mitigation Measure C.2 could reduce the impact of increased truck noise to a level that would <br /> be less than significant,if residences request funding and implement the soundproofing <br /> ' measures. Other than Mitigation Measure C.2,no additional mitigations are available for this <br /> impact other than reducing project operations(Project Alternative 6). Reducing project <br /> operations would be a substantial change to the proposed project and therefore is addressed as <br /> a component of Alternative 2B(Reduced Size/Reduced Daily Operations Alternative)in <br /> ' Chapter V of the 2013 EIR. <br /> 13. (C.3)Identified in 2013 EIR and revised in this SEIR: <br /> The Landfill shall implement one of the following two options to mitigate this potentially <br /> significant impact: <br /> Page 7 <br />