Laserfiche WebLink
Forward Inc. Landfill Expansion Project MMRP <br /> Forward Landfill before the total increased fugitive LFG release rate from all sources <br /> reaches 150 cfm (equivalent to 10 tons of ROG per year). <br /> 25. Austin 1994(GS.b),Austin 2000(GS.b) <br /> Excessively odorous wastes shall be mixed immediately with other landfill wastes, depending <br /> on their nature and source. If diluting the intensity of odor is not sufficient, then the operator <br /> shall immediately cover offensive materials as soon as they arrive at the landfill. <br /> 26.Austin 1994(G5.c),Austin 2000(G5.c) <br /> The operator shall ensure that loading, unloading, and material handling activities are <br /> carried out efficiently and without delays to avoid excessive odors. <br /> 27. Forward 1993(DI) <br /> Use water trucks and/or sprinkler systems to apply water a minimum of twice daily to <br /> roadways and active faces of asbestos disposal areas to minimize airborne dust leaving the <br /> site. It is recognized that a balance must be struck between maintaining sufficient moisture <br /> for dust control and applying too much moisture such that the generation of excess leachate <br /> occurs. The conditions of the active faces of a landfill, as well as the leachate generated, <br /> must be monitored and professional judgment utilized at all times to keep these two factors in <br /> balance. <br /> 28. Forward 1993 (D2) <br /> Portions of the site that either have been filled to the extent allowed or are not expected to be <br /> worked for extended periods (six months or longer)shall be sown with fast-germinating <br /> drought-tolerant grass seed and watered until a cover of vegetation is established. <br /> 29. Austin 1994(GI.b),Austin 2000(GI.b) (similar) <br /> The project sponsor shall seek to minimize the extent of area exposed to wind erosion. <br /> Exposed surfaces, including stockpiles, shall be vegetated to the extent possible. <br /> 30.Austin 1994(GI.c),Austin 2000(GI.c) <br /> Plan and phase construction and closure operations such that they do not take place <br /> simultaneously on dry windy days. Schedule particularly dusty activities on separate days. <br /> 31.Austin 1994(GI.d),Austin 2000(GI.d) <br /> Design the site filling plan to facilitate screening of the active face from the prevailing winds, <br /> whenever possible, to minimize the amount of windblown dust released from the working <br /> face. <br /> 32.Austin 1994(GI.e),Austin 2000(GLe) <br /> Haul trucks carrying easily airborne material shall be covered during transport and sprayed <br /> with water prior to dumping if it is shown that this would reduce dust emissions during off- <br /> loading activities within the landfill. <br /> 33.Austin 1994(Gl fi,Austin 2000(GI:) <br /> The landfill operator shall restrict truck and equipment travel over loose, uncompacted, ' <br /> unpaved surfaces. <br /> 3.1. Forward 1993(D5) <br /> A particulate/meteorological monitoring station should be installed on the project site, <br /> preferably near the site boundary with one of the closer residential receptors. This <br /> monitoring station should be operational for a minimum of six months during the dry season <br /> Page 12 <br />