Laserfiche WebLink
April 4, 2012 <br /> g. 18 Forward 1993 (D2) <br /> Portions of the site that either have been filled to the extent allowed or are <br /> not expected to be worked for extended periods (six months or longer) <br /> shall be sown with fast-germinating drought-tolerant grass seed and <br /> watered until a cover of vegetation is established. <br /> Current Status: An intermediate cover is placed on areas of the site that <br /> have reached intermediate or final grades. These areas are then <br /> hydroseeded. <br /> h. 19 Austin 1994(G1.b), Austin 2000(G1.b) (similar) <br /> The project sponsor shall seek to minimize the extent of area exposed to <br /> wind erosion. Exposed surfaces, including stockpiles, shall be vegetated <br /> to the extent possible. <br /> Current Status: Working areas are minimized to the extent feasible. Areas <br /> that are not active are hydroseeded to the extent possible. <br /> i. 20 Austin 1994 (G1.c), Austin 2000(G1.c) <br /> Plan and phase construction and closure operations such that they do not <br /> take place simultaneously on dry windy days. Schedule particularly dusty <br /> activities on separate days. <br /> Current Status: Construction of new waste management units typically <br /> occurs on an annual basis. Given the site development plans for the landfill, <br /> placement of final cover will typically occur once all waste management units <br /> in an area are filled to their final grades. Construction of new WN1Us and <br /> placement of final cover will, therefore, not typically coincide. However, if <br /> construction and closure operations do occur simultaneously, construction <br /> operations will be phased so that the dust from construction is controlled <br /> according to the above requirements. In addition, Forward informs <br /> Contractors of their responsibilities regarding dust control during <br /> construction. <br /> j. 21 Austin 1994 (G1.d), Austin 2000(G1.d) <br /> Design the site filling plan to facilitate screening of the active face from the <br /> prevailing winds, whenever possible, to minimize the amount of windblown <br /> dust released from the working face. <br /> Current Status: To the extent feasible, the operator will fill each waste <br /> management unit to facilitate screening of the active face from prevailing <br /> winds. <br /> k. 22 Austin 1994 (G1.e), Austin 2000(G1.e) <br /> Page 35 <br />