Laserfiche WebLink
April 4, 2012 <br /> Current Status: A sign is posted to restrict idling time to ten minutes. <br /> p. 27 Austin 1994(G2.a), Austin 2000(G2.a) <br /> All internal combustion engine driven equipment should be property <br /> maintained and tuned according to manufacturers specifications. <br /> Current Status: Forward routinely maintains all onsite equipment to <br /> manufacturer's specifications. <br /> q. 28 Forward 1993 (D8) <br /> All VOC-contaminated soil which is not being treated shall be covered with <br /> six-mil non-porous plastic. <br /> Current Status: VOC contaminated soils are disposed directly into <br /> appropriate waste management units and covered as part of daily cover <br /> operations. <br /> r. 29 Forward 1993 (D9) <br /> If VOC emissions exceed APCD limits for open aeration, a VOC collection <br /> and removal system shall be installed to minimize VOC emissions. <br /> Current Status: Forward is not currently treating VOC contaminated soils <br /> by open aeration. VOC contaminated soils are disposed directly into <br /> appropriate waste management units and covered as part of daily cover <br /> operations. <br /> s. 30 Forward 1993 (D10) <br /> Any net increase in VOC emissions which remain after the installation of a <br /> collection/removal system shall be offset to the degree required by <br /> SJVUAPCD Rule 220.1 <br /> Current Status: Forward is not currently treating VOC contaminated soils. <br /> VOC contaminated soils are disposed directly into appropriate waste <br /> management units and covered as part of daily cover operations. <br /> t. 31 (E.1) <br /> Proposed as Part of the Project: <br /> Use a total of 17 pieces of equipment (at any given time) over the life of <br /> the project to minimize particulate discharge. As shown in Table IV.E-1 (of <br /> the EIR) the risk from particulate—and specifically diesel fumes—was <br /> lessened for the project versus the baseline conditions is the existing 28 <br /> pieces of diesel powered landfill operating equipment to be changed out <br /> every 5 years at Forward and every 10 years at Austin would be changed <br /> Page 37 <br />