Laserfiche WebLink
�g <br /> , <br /> 2, <br /> Attachment 1: Mitigation Measures, Page 9, Mitigation No. BB: <br /> Benchmarks shall be established, (these could utilize monitoring well top of casing <br /> elevation), which will allow for determinations of settlement/consolidation of fill materials <br /> in closed sections of the landfill on an semi-annual basis and following significant <br /> seismic events (modified Mercalli Scale of V or above). In the event that changes are <br /> noted, the cause should be determined as should the effect on leachate collection and <br /> recovery systems. Repair liners and LCRS as necessary. In addition, remedial grading <br /> should be accomplished to restore the original cap's function to repel water and direct <br /> surface runoff. <br /> CTM:ss <br /> UP9112DC <br /> c: Forward Inc. <br /> t <br />