The existing manure management system is adequate for the existing facilities and operations. <br /> The expansion of herd population at Phase I through Phase IV will require site improvements <br /> necessary to accommodate this growth. <br /> • Phase►— In phase one (fall 2003) install a state of the art milking parlor, a well, and two state <br /> k of the art freestall barns to accommodate a population of 960 lactating cows. Replace the <br /> existing settling pond with a new settling pond and extend the lagoon. Install nstall a manure solids <br /> storage area, and install a manure water irrigation system with drain ditches and return system <br /> designed to control all onsite water. <br /> • Phase ft—(spring 2005) install two additional freestall barns and a well to'bring g brin lactating cow <br /> population to 1310. Install a new settling pond. <br /> • Phase BY— (spring 2007) install two additional freestall barns to bring lactating cow population <br /> t ' to 1665. <br /> ,-�. • Phase►V— (spring 2008) install two additional freestall barns to bring lactating cow population <br /> to 1900. <br /> The projected capacity required at this facility (based on a six month storage of manure effluent, <br /> milk parlor water and rainfall runoff) to ensure the maximum volume can be retained on site is <br /> 10,364,203 gallons (Phase 1), 13,595,590 gallons (Phase ll); 17,034,478 gallons (Phase III);. <br /> 19,511,090 gallons (Phase IV); and adding the 3.4 inches from a 25 year 24 hour storm is <br /> 2,630,105 n gallons (Phase 1), 3,212,889 $ gallons (Phase 11), 3,555,172 B gallons (Phase III), <br /> 4,009,452 B gallons (Phase IV), resulting in a total volume of manure effluent to be 12,994,308 <br /> gallons (Phase 1), 16,808,479 gallons (Phase Il); 20,589,650 gallons (Phase 111); and 23,520,542 <br /> gallons (Phase IV). <br /> CAPACITY LIMITS GALLONS <br /> Phase I Phase 11 Phase III Phase IV <br /> _ Accumulation of Manure 10,364,203 13,595,590 17,034,478 191511;090 <br /> Effluent and Rainfall Runoff <br /> Rainfall Runoff 25 r.124 hr. 2,630,105 3,212,889 x`3,555,172 4,009,452 j <br /> Total Capacity Required 12,994,308 16,808,479 20,589,650 23,520,542 <br /> Settling Pond I Lagoon 20,619,164 23,755,198 23,755,198 23,755,198 c <br /> Storage Capacity (Projected) <br /> � Notes: <br /> A. For Phase I, Capacity of lagoon is sufficient to retain all liquids. Settling pond will not be <br /> needed for winter rainfall storage. <br /> B. Capacity includes storage for one settling pond, in lieu of two ponds. The design of settling ; <br /> ponds is to retain the solids, and the liquids will overspill from one pond to the other; then ' <br /> to the flush lagoon. Therefore, both ponds will never be full simultaneously. Refer to <br /> •-� Effluent Calculations, Appendix F. <br /> C. Please note that the projected capacity is higher than the required capacity. j <br /> P <br /> f . <br /> Refer to page 22 for Endnotes and Reference Sources <br /> Western Dairy Design Associates,Inc.2003 <br /> 4 Page 2 <br /> � r <br /> e r <br /> � r <br />