My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0001199 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26310
>
2600 - Land Use Program
>
LA-00-98
>
SU0001199 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:28:30 AM
Creation date
9/4/2019 10:16:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0001199
PE
2690
FACILITY_NAME
LA-00-98
STREET_NUMBER
26310
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
10/17/2001 12:00:00 AM
SITE_LOCATION
26310 S BANTA RD
RECEIVED_DATE
1/9/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BANTA\26310\LA-00-98\SU0001199\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPTIC TANK CAPACITY EXAMPLE FOR PARCEL 2: <br /> Recommended tank capacity for a pump out interval of three yrs: 2.8(QAVE) x Peaking Factor (PF) <br /> = 2.8(32 people x 15 gals/day=480 gals/day) x 1.5 = 2,016 gal tank capacity required: <br /> rU_se one - 2,000 gallon tank' <br /> SEPTIC TANK CAPACITY EXAMPLE FOR PARCEL 3: <br /> Recommended tank capacity for a pump out interval of three yrs: 2.8(QAVE) x Peaking Factor (PF) <br /> =2.8(27 people x 15 gals/day=405 gals/day) x 1.5 = 1,701 gal tank capacity required: <br /> Use one - 2,000 .gallon tank.- <br /> DETENTION TIME EXAMPLE FOR PARCEL 1: <br /> Detention Time = 1,200 gal tank cgpacity capacityx 0.70 30%volume lost to sludge/scum accumulation <br /> 1.5 (Peaking factor) x 270 gals/day <br /> Detention Time =2.1 days: The minimum acceptable detention time is 1.0 day. <br /> DETENTION TIME EXAMPLE FOR PARCEL 2: <br /> Detention Time =2,000 gal tank capacity x 0.70 (30%volume lost to sludge/scum accumulation <br /> 1.5 (Peaking factor) x 480 gals/day <br /> Detention Time =:2.0 days:The minimum acceptable detention time is 1.0 day. <br /> DETENTION TIME EXAMPLE FOR PARCEL 3: <br /> Detention Time =2,000 gal tank cqVacity x 0.70 30% volume lost to sludge/scum accumulation <br /> 1.5 (Peaking factor) x 405 gals/day <br /> Detention Time 2.3 days.-The minimum acceptable detention time is 1.0 day. <br /> LEACHFIELDSIFILTER BEDS <br /> LEACHFIELDIFILTER BED EXAMPLE FOR PARCEL 1: <br /> 1,200 gallon septic tank. Therefore, the Base Tank Capacity= 1,200 gal: <br /> Base Tank Capacity (BTC) + Average Daily Flow(ADF) x Soil Factor (SF) _ <br /> 1,200 gal BTC-+-(270 gal x 5 days/7 days = 193)= 1,393 ADF x .250 SF=348 lineal ft of leachline <br /> ,FILTER BED = 348 LFLL x 4 = 1;393 sq ft <br /> LEACHFIELD/FILTER BED EXAMPLE FOR PARCEL 2: <br /> 2,000 gallon septic tank. Therefore,the Base Tank Capacity = 2,000 gal: <br /> Base Tank Capacity (BTC) +Average Daily Flow (ADF)x Soil Factor(SF) _ <br /> 2,000 gal BTC +(480 gal x 5 days/7 days=343)=2,343 ADF x .250 SF =,5.86 lineal ft of.leachline' <br /> FILTER BED = 586 LFLL x 4 =2,343 sq ft <br /> LEACHFIELDIFILTER BED EXAMPLE FOR PARCEL 3: <br /> 2,000 gallon septic tank. Therefore, the Base Tank Capacity = 2,000 gal: <br /> Base'.Tank Capacity (BTC) + Average Daily Flow(ADF) x Soil Factor (SF) _ <br /> 2,000 gal BTC +(405 gal x 5 days/7 days=289)=2,289 ADF x .250 SF = 572 lineal ft of leachline <br /> iFILTER BED = 572 LFLL x.4 = 2,289 sq ft- <br /> 10 <br /> vafley Ag Research <br />
The URL can be used to link to this page
Your browser does not support the video tag.