Laserfiche WebLink
Ms. Becky Wood <br /> Teichert aggregates - 2 - 30 August 2042 <br /> r <br /> i <br /> I <br /> to ensure adequate containment. Please relate the pond rise to beginning and ending <br /> freeboard conditions and explain how spills will be prevented under the tan g <br /> 4. Provide a similar spreadsheet for the average annual rainfall year year scenario, <br /> disposal capacity is available duringt Y to show whether adequate <br /> pond volume he average rainfall year without Significantly increasing <br /> 5. Based on the revised water balance and predicted sedimentation rates,Pre <br /> dzct when <br /> the <br /> pondswill no longer provide sufficient cient storage and disposal capacity at <br /> current production rates. <br /> We will proceed with development of tentative WDRs upon receipt of this information <br /> ��._ �.imary�. :r_ _ <br /> As you may kriaw, Itliougl Tim O- <br /> 'BH is the'- <br /> iona Oa <br /> have been assigned to work with you on developmet of th erev'sed WDRoOard n a you e <br /> t facility, I <br /> nT � <br /> questions about the RWD or revised WDRs, please call me at (916) 255-3140, <br /> any <br /> r <br /> ANNE L. OLSON, P.E. <br /> Water Resources Control Engineer <br /> cc: Mike Huggins, San Joaquin County Environmental Health De IL <br /> partment, Stockton � <br /> p <br /> i <br /> I <br /> .4 <br /> I <br /> N <br /> . i <br /> f <br />