Laserfiche WebLink
a <br /> 900"d IV101 <br /> N'U-V-ZU- LUDO 11 -44AM UP )FAnIMtNI OF I HAN5 PUN I A I I UN No-4537 P 3/3 <br /> Ms. Kubl ' <br /> November 28, 2005 <br /> Page.Z <br /> * AUgust 24,2005 Winn Tri clhg Traffic Impact Study <br /> An Encroachment Permit will be required for work(if any) done within the• <br /> Departrncnt's right of way. This work is subject to the California Envirownental <br /> Quality A.ct. .Therefore,additional biological, archaeological, or other environmental . <br /> studies may be rewired as part of the encroachmentis a lycation. A. <br /> Pew PP • qualified. <br /> professional must conduct aory.such studies undertaken to satisfy the Department's <br /> environmental revie.v <br /> -responsibilities.p cs. Crcound disturbing achrntres to the site prior to- <br /> completion and/or approval of required environmental documents may affect the <br /> Department's ability to issue a permit for the project. Purthermore, ifen rim. <br /> plans.or drawings will be part of your permit application, they should be prepared in <br /> standard units. <br /> • All roadway features (for.example signs,pavement delineation,roadway since et <br /> Cetera) within Department right of way must be protected or maintained in a <br /> temporary condition and restored. _ <br /> • <br /> Please forty <br /> and the Final Conditions of Approval to the Transportation Planning - <br />' <br /> Division in order to monitor tansportation related mitigation measures. <br /> If you have any questions or would like to discuss our comments in more detail,please <br /> contact Dan Brewer at(209) 948-7142 (e7mail:_dan.brewex a dot.cago <br /> 941-1921. v) or me at(209) <br /> Sincerely, <br /> TO DUM,A,S, Chief <br /> Office of Intermodal Planning <br /> CC: Scott Morgan State Clearinghouse <br /> "CaTtruxs <br /> improw-V 1116bffry acral ca4fanda <br /> 900'd SMHON I2iV313 SIMS 86:80 900Z-ZZ-09C <br />