My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004657
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
24717
>
2600 - Land Use Program
>
QX-94-0002
>
SU0004657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:08:55 AM
Creation date
9/4/2019 10:37:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004657
PE
2656
FACILITY_NAME
QX-94-0002
STREET_NUMBER
24717
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
02316002, 03 &
ENTERED_DATE
10/8/2004 12:00:00 AM
SITE_LOCATION
24717 E BRANDT RD
RECEIVED_DATE
10/7/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\24717\QX-94-02\SU0004657\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance with <br /> conditions of approval, and compliance with County and state mining regulations, the applicant shall <br /> provide performance guarantees as a condition of the issuance of the Quarry Excavation Permit. <br /> The amount and form of the guarantee shall be subject to annual review and approval by the County <br /> and the state, and the amount shall be adequate to ensure reclamation of disturbed land and/or land <br /> to be disturbed during a given phase. The annual review of the financial guarantee shall be <br /> coordinated with the annual inspection and approval of successive reclamation security so that the <br /> guarantee includes the amount of disturbed land plus the amount of land estimated to be disturbed <br /> during the next 12 months, less the amount of land previously determined by Development Services <br /> Division annual inspection to have been reclaimed. The performance guarantee shall be in the form <br /> of either: 1) a surety bond, 2) a trust fund with the lead agency, or 3) an irrevocable letter of credit. <br /> Any interest accrued in a trust fund shall stay with the trust fund account. The financial guarantee <br /> shall be payable to "San Joaquin County or the Department of Conservation" under the applicable <br /> provisions of the County and the state mining regulations. The financial guarantee shall be callable <br /> by the County or the State under the following circumstances: <br /> 1). The applicant causes the excavation to become idle (as defined in Section 9-110 of the <br /> Development Title)without an approved interim management plan; <br /> 2). The applicant files for bankruptcy; <br /> 3). The County or State determines on the basis of annual inspections and reports that the applicant <br /> has not maintained substantial compliance with the approved Permit; <br /> 4). There arises an occurrence or circumstance which, in the opinion of the County or State, <br /> jeopardizes the site reclamation; or <br /> 5). The State makes one or more of the findings specified in Section 2774.4(a) of the State Public <br /> Resources Code. <br /> In any instance that the County or State makes the demand for partial or full tender of the financial <br /> guarantee of performance, the County and/or state may use all or any portion of.the financial <br /> guarantee to reclaim the site and to recover its administrative costs associated therewith. <br /> (Development Title Section 9-1415.3[r]) <br /> s. ENFORCEMENT: Except as otherwise provided in State Mining Regulations, the County shall have <br /> authority to enforce provisions of the Surface Mining and Reclamation Act. The County may <br /> exercise all enforcement regulations available under the County Development Title and the State <br /> Public Resources Code. Such enforcement measures include charging the applicant the costs of <br /> administering an enforcement action. The basis for charging fees for an enforcement action shall be <br /> a time and materials compensation. (Development Title Section 9-1415.3[t]) <br /> t. STATE AND FEDERAL PERMITS: Prior to initiation of excavation activities that would result in the <br /> filling or degradation of waters of the United States (eastern portion of Phase II, and Phases III and <br /> IV), the U.S. Army Corps of Engineers and the State Department of Fish and Game should be <br /> contacted to determine if a Section 404 and a Streambed Alteration Agreement, respectively, are <br /> necessary. <br /> u. AVOID FILLING OR DEGRADING WATERS OF THE U.S., INCLUDING WETLANDS: The <br /> excavation boundaries in the southeastern portion of the site shall be revised to exclude the <br /> seasonal wetlands that provide habitat for special-status shrimp species. The revised boundary shall <br /> be shown on the Improvement Plan. <br /> San Joaquin County QX-94-21KRC Aggregates <br /> Community Development Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.