My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004657
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
24717
>
2600 - Land Use Program
>
QX-94-0002
>
SU0004657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:08:55 AM
Creation date
9/4/2019 10:37:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004657
PE
2656
FACILITY_NAME
QX-94-0002
STREET_NUMBER
24717
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
02316002, 03 &
ENTERED_DATE
10/8/2004 12:00:00 AM
SITE_LOCATION
24717 E BRANDT RD
RECEIVED_DATE
10/7/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\24717\QX-94-02\SU0004657\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n C1 <br /> i. TREE REPLACEMENT: The operator shall compensate for the loss of Native Oaks andHeritage <br /> f ` Oaks pursuant to Development Title Section 9-9505.4 and subject to the guidelines and <br /> requirements specified in Chapter 4.2 of the Final EIR, Mitigation Measure 4.2-1. l� <br /> j. AVOID OR REDUCE LOSS OF BLUE OAK WOODLAND: The operator shall exclude.�from the <br /> area to be excavated the 9 acres of blue oak woodlands shown on the Biological Resources Map <br /> contained in the Final EIR. This shall be shown on the Improvement Plan. A minimum 10 1ifoot-wide <br /> buffer shall also be established outside the dripline of blue oaks in the oak woodland during <br /> excavation in that area. No construction activities shall occur within the fenced area. (Deye lopment <br /> Title Section 9-1505.5) <br /> k. SETBACKS: No excavation shall take place within twenty-five (25) feet of any property line or right- <br /> of-way. (Development Title Section 9-1415.3[j]) 11 <br /> Id periods <br /> 1. TEMPORARY CUT SLOPES AT SETBACK LINES: Temporary cut slopes (i.e., for linllies shall not <br /> of time,slopes that are in the process of extraction prior to bete <br /> ing backfilled) at <br /> exceed one (1) foot horizontal to one (1) foot vertical, except that temporary cut slopes at setback <br /> lines to a maximum of one half(112) of a foot horizontal to one (1) foot vertical may be maintained if <br /> site-specific geologic and engineering analysis demonstrate through a slope stability analysis that the <br /> proposed temporary cut slopes will have a minimum slope stability factor of safety as required in <br /> Section 9-1415.3(k)(4). However, in the event that there are existing structures on the adjacent <br /> k property (or the immediate potential for structures on the adjacent property), the excavation shall at <br /> not time be closer to the property line than a line projected on a slope of one (1) to one (1�} from the <br /> property line to the toe of slope. <br /> 21feehorizontal to <br /> t <br /> m. FINAL SLOPES: Final cut and/or fill slopes shall not exceed#wee4gYfeet two_ ( -- <br /> one(1)foot vertical, except as specified below. <br /> i I <br /> k n. FILL SLOPES: Fill slopes shall be constructed consistent with recommendations <br /> from,a qualified <br /> civil/geotechnical engineer based upon site-specific geologic conditions. (Development Title Section <br /> "I 9-1415.3(k)(7)) <br /> o. PONDING: All water utilized in the plant operation shall be disposed of behind a closed dike. <br /> (Development Title Section 9-1415.3[n]) <br /> p. EXCAVATIONIRECLAMATION SCHEDULE: The reclamation plan shall show the (phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed,within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> eing reclaimed while one phase is being"excavated <br /> paint of time a maximum of one phase is b . <br /> (Development Title Section 9-1415.3[o]) <br /> q <br /> ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted <br /> County <br /> by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan. <br /> may use professional services as provided for in Section 9-240.11. The consultant shaft be selected <br /> by San Joaquin County. Upon completion of the annual inspection, the person in charge of the <br /> mining operation shall submit to the State Geologist and the County a report which shall contain all <br /> the information as required by Section 2207 of the Public Resources Code. The cost of the <br /> inspection shall be paid by the mine operator. Additional inspections may be conducted, but the cost <br /> of additional inspections shall be paid for by the mine operator only if non-compliance with the <br /> conditions of the Quarry Excavation Permit or the reclamation plan is found. (Developpment Title <br /> Section 9-1415.31q]) <br /> QX-94-21KRC Aggregates <br /> San Joaquin County Page 6 <br /> Community Development ip <br />
The URL can be used to link to this page
Your browser does not support the video tag.