My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012928
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLLIER
>
3222
>
2600 - Land Use Program
>
GP-91-4
>
SU0012928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 9:31:04 AM
Creation date
9/4/2019 11:26:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012928
PE
2691
FACILITY_NAME
GP-91-4
STREET_NUMBER
3222
Direction
E
STREET_NAME
COLLIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00514607
ENTERED_DATE
1/16/2020 12:00:00 AM
SITE_LOCATION
3222 E COLLIER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\COLLIER\3222\GP-91-4\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> DEVELOPMENT' COMMITTEE MEMORANDUM <br /> GP-91-4 <br /> PAGE TWO <br /> �/4 a��g NE® <br />` 2 . Show and explain any drainage easements or public lots. <br /> r <br /> 3 . Show all proposed parcel lines dark and heavy. <br /> 4 . Show structures to be removed with light dashed lanes. Show <br /> structures to remain with light solid lines. Also show the <br /> distances from the remaining buildings to the parcel lines. <br /> Will parts of the fence remain? <br /> 5. Note No. 9 on the map is inaccurate. The current zoning is <br /> AL-10, not RR-65. <br /> PROCESSING PROCEDURE <br /> To proceed with this project, the applicant may process the <br /> General Plan Map Amendment, Zone Reclassification, and Major <br /> Subdivision Applications concurrently. However, the Major <br /> Subdivision cannot be approved until after the General Plan Map <br /> Amendment and Zone Reclassification become effective. Since the <br /> effective date of those applications would be 30 days after the <br /> Board of Supervisors takes action, a waiver of the 50-day time <br /> limit for acting on tentative maps is necessary. A request for <br /> the waiver must be submitted with the Major Subdivision <br /> Application. If the applicant chooses, he may process the Major <br /> Subdivision separately, at a later date, and avoid the need for a <br /> time waiver. <br /> NOTE: The pre-application conference is designed to inform <br /> prospective applicants of the general plan cons, stency, <br /> zoning consistency, public improvement <br /> requirements,preliminary design constraints and <br /> opportunities, and major environmental and safety <br /> issues. This information is provided in the hope of <br /> assisting the applicant in submitting a better and more <br /> complete application, as well as minimizing processing <br /> time. It is not intended to be an in-depth analysis, <br /> and, and environmental assessment is not completed. <br /> The applicant should be aware that a detailed review <br /> will not be done until the full application is <br /> submitted. Also, if new or additional information is <br /> obtained, a revised application or environmental impact <br /> report may be required. <br /> c: J. Wilson <br /> C. Meade <br /> Armstrong Engineering <br /> CTM\cm <br /> GP9104DC.CTM <br />
The URL can be used to link to this page
Your browser does not support the video tag.