Because of the.potential high water table, the septic tank should be-installed as high in elevation as <br /> possible: If groundwater.is encountered during tank emplacement,straps, deadmen, or some other <br /> restraining method must be used to counteract buoyancy. Only.one-third of the septage should ever <br /> be pumped out,.or if pumped out completely, the tank should be immediately refilled with water. <br /> Secondly, the influent lin.e.-coming=from the Mosque must also be as high in elevation as possible. <br /> The line should come through the footing of the building. The contractor, plumber and septic <br /> system installer all must be made aware of this. <br /> MONITORING <br /> To check for standing effluent at the soil-effluent interface, two four-inch O.D. FVC tee's should be <br /> placed at the interface at each end of the filter bed and extend through the rock and up through the <br /> soil surface (See AppendiX:A)s A threaded cap should be used to cover the tube. <br /> If it appears that the soils cannot manage the effluent flows; the 100%reserve area must be <br /> activated. Consideration must be given to changing disposal methods within the reserve area, such <br /> as pressurizing the effluent for complete and equal distribution as high in elevation as possible. <br /> A water meter should be installed on the service line entering the Mosque to monitor and ensure <br /> water usage is not excessive.° Restricting water use also includes checking for water leaks in toilets, <br /> dripping faucets, etc. on a_regular monthly basis. <br /> Given that the blackwater wastes inflowing into the septic_tank are projected to be a very small <br /> volume, it is anticipated to have:the'tank pumped every five years, or pump-out based upon <br /> monitoring the scum and sludge thicknesses by a septic contractor after two years of operation. <br /> MAINTENANCE <br /> A maintenance program should be established-for the entire wastewater disposal system. As <br /> referenced,predicting septic tank pump-out intervals is impossible due to the number of unknowns. <br /> These unknowns lead to changes in the quantity; quality and operational parameters of the proposed <br /> wastewater disposal system. <br /> Sprinkler irrigation over the disposal area must be carefully considered so as to not inundate this <br /> area. During the spring and summer months,,irrigation should be done intermittently during the <br /> day and/or evening hours. For example, the sprinklers could run for five minutes, six times per <br /> day. Irrigation during the wintertime should be suspended. Run times and number of daily <br /> irrigations should be determined by the landscape contractor. <br /> Another source of nitrate loading can be from the lawn or other landscape-type plants that may be <br /> planted over the disposal area. It is recommended not to use any nitrogen fertilizer in these areas. <br /> If it is deemed necessary to use them, "snow release"nitrogen fertilizers should be used on the. <br /> lawns and/or landscaping to reduce nitrate loading from these areas. <br /> 17 <br /> Chesney Consulting <br />