Laserfiche WebLink
OPO.0 IIy C 09 <br /> p ! THOMAS R. FINN R O.BOX 1810-1810 E.HAZELTON AVENUE <br /> w' STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR (209)468-3000 FAX(209)468-2999 <br /> www.sjgov.orglpubworks <br /> THOMAS M.GAU <br /> k CHIEF DEPUTY DIRECTOR <br /> MICHAEL SELLING wor YOU <br /> DEPUTY DIRECTOR ����I�LD <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR �lrc� r� <br />` ROGER JANES ALIG 2 S 2010 <br /> BUSINESS ADMINISTRATOR <br /> Community Development Dept" <br /> I <br /> I August 24, 2010 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Alex Chetley, Engineer VAC <br /> Public Services Division <br /> SUBJECT: PA-1000152;A Minor Subdivision application including lot line adjustment among three parcels <br /> totaling 62 acres to result in two parcels and one remainder-parcel; located on the north side of <br /> Eight Mile Road three-quarters of a mile cast of Jack Tone Road in Linden. <br /> f (Supervisorial District 4) <br /> I <br /> PROPERTY OWNER: Jeanne Zolezzi APPLICANT: Dillon &Murphy <br /> k ADDRESS: 14807 E. Eight Mile Road,Linden APN: 065-070-10, 36 &37 <br /> l <br /> INFORMATION: <br /> A portion of the site within the Calaveras River is currently located in a Federal Flood Insurance Administration <br /> Designated Flood Hazard Area designated as Zone AE. The 100-year Flood Elevation will be approximately 80- <br /> 83 feet NAVD. <br /> Eight Mile Road has an existing right-of-way width of 50 feet and a planned right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> F <br />