My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006060
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
0
>
2600 - Land Use Program
>
PA-0600146
>
SU0006060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 11:19:20 AM
Creation date
9/4/2019 6:10:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006060
PE
2611
FACILITY_NAME
PA-0600146
STREET_NUMBER
0
STREET_NAME
MOUNTAIN HOUSE
City
MOUNTAIN HOUSE
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
MOUNTAIN HOUSE
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\E\ESTES\PA-0600146\SU0006060\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE MASTERPLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> Impact Mitigation Measure Monitoring Person/ Timing or <br /> Requirements Agency Frequency of <br /> Res onsill Monitorin <br /> Many of the mitigation measures from the Final Environmental Impact Report have been incorporated Into the Master Plan,Master Plan Appendices, Specific Plan I,and Public Financing Plan. <br /> Some mitigation measures have been included as Amendments to the San Joaquin County General Plan and/or the Mountain House Development Title. Compliance with these mitigation <br /> measures will occur as a function of the implementation of these various plans, <br /> WATER SUPPLY <br /> M4.4.1.1 a)If potential or proposed restrictions on diversion would cause the confirmed water Review of SJCDPW SP <br /> Inadequate raw water storage facilities may supply to be insufficient to serve the project as proposed in the Master Plan,then Subsequent <br /> result in interruption of water service, the specific plans shall identify additional water conservation/reuse measures to be Specific Plans. <br /> especially if restrictions on water diversion incorporated into the project to ensure that the demand would not exceed the <br /> were imposed by State or Federal agencies. confirmed supply. <br /> M4.4.1-5 a)Industrial reuse of water treatment sludge shall be practiced to the maximum Plan review, MHCSD,SJCDPW DP for water <br /> Water treatment sludge disposal could extent possible.The Community Service District shall consider other disposal treatment plant <br /> adversely impact local water quality or options only if industrial reuse were Infeasible, <br /> unnecessarily occupy scarce landfill space. <br /> M4.4.1-6 a)Chemical Selection and Facilities.Prior to the plants,chemicals associated with Review MHCSD,SJCDPW DPs for water and <br /> An uncontrolled release of hazardous water and wastewater treatment operations shall be carefully selected to minimize Plan/Engineers waste-water <br /> materials associated with water treatment the hazard.Chemical handling and storage facilities shall be designed to minimize Report treatment plants <br /> practices could potentially occur and impact and effectively mitigate the potential for accidental releases,including such features <br /> water resources and public health. as secondary containment,alarms,remote sensing Instruments,and other safety <br /> features. <br /> WASTEWATER <br /> M4.4.2-1 a)Additional wastewater treatment processes shall be provided If unrestricted use Plan review. SJCDPW SP <br /> Inadequately treated reclaimed wastewater reclamation,including irrigation on-site,industrial/commercial reuse,or surface <br /> could impact local surface and groundwaters water discharge were implemented. <br /> and public health. Insufficient reclamation <br /> sites could result in illegal and inappropriate <br /> discharge of treated wastewater, <br /> b)The permit application for the wastewater treatment plant shall include a Review SJCDPW DP for treatment <br /> schedule for design,construction,and permitting for the plant to ensure that the Development plant <br /> wastewater treatment and reclamation facilities would be operational prior to the Permit application. <br /> approval of the first final subdivision map. <br /> c)Each Development Permit for the wastewater treatment plant shall describe the Review SJCDPW DP for treatment <br /> mechanism by which the construction of additional facilities for incremental Development plant <br /> expansion in treatment capacity shall be completed before the existing capacity is Permit application. <br /> exceeded. <br /> PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.