My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008716
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EUNICE
>
25414
>
2600 - Land Use Program
>
PA-1100059
>
SU0008716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:38 AM
Creation date
9/4/2019 6:10:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008716
PE
2625
FACILITY_NAME
PA-1100059
STREET_NUMBER
25414
Direction
N
STREET_NAME
EUNICE
STREET_TYPE
AVE
City
ACAMPO
APN
00513011
ENTERED_DATE
4/18/2011 12:00:00 AM
SITE_LOCATION
25414 N EUNICE AVE
RECEIVED_DATE
4/18/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\APPL.PDF \MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\CDD OK.PDF \MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\EH COND.PDF \MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions of Approval <br /> Use Permit Application No. PA-1100059 was approved by the Planning Commission on The <br /> effective date of approval is . This approval will expire on , which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force, and (3) all necessary permits from <br /> other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Rick Griffin, [209]468-3154) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs,existing and proposed utility services, and grading(refer to the SITE <br /> PLAN CHECK LIST'for details). Foundation and soils investigation shall be conducted in <br /> j conformance,with Chapter 18 of the California Building Code at the time of permit application. A fee <br /> is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for 149-foot tall radio communications tower as shown on the <br /> Site Plan dated April 11, 2011 (Use Type: Communication Services:Type II). <br /> c. CAPITAL FACILITY FEE:FThis project may be subject to the Capital Facility Fee If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) The proposed tower and accompanying equipment shelter shall be set back a minimum of ten <br /> feet from the side property line and fifteen feet from the rear property line. (Development Title <br /> Section 9-310.5) <br /> (2) New freestanding support structures shall be located a distance equal to at least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title Section <br /> 9-1065.4[d]) <br />` e. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting equipment <br />�. associated with wireless telecommunication shall be maintained in good condition by the provider of <br /> the telecommunication facility and,whenever necessary, repaired or replaced. (Development Title <br /> Section 9-1065.7) <br /> i f. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for a <br /> period of six(6)consecutive months. Removal and site restoration shall be completed within ninety <br /> (90)days of the end of said six(6)month period. (Development Title Section 9-1065,8) <br /> San Joaquin County PA-11000591Woodbridge Fire District <br /> Community Development Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.