Laserfiche WebLink
2) Construct a 580 foot long eastbound left-tum lane on W. Grant line Road approaching the <br /> main project entry. <br /> 3) Construct a two-way left-turn lane on W.Grant line Road extending easterly from the <br /> project's main entrance and continuing 450 feet easterly from the east entrance. <br /> 4) Construct a westbound right-tum lane from the west entrance and continuing 100 feet <br /> easterly from the east entrance. <br /> 5) Stripe and sign the west entrance access to indicate the following movements are allowed: <br /> a. Right in. <br /> b. Right out. <br /> e. The site shall be designed to contain the storm water runoff on site and to prevent offsite <br /> sediment transport. Provide drainage facilities for both phases of the project and meet the <br /> requirements of San Joaquin County Development Standards to prevent the increased runoff <br /> release rate of storm water from discharging onto other properties. Retention basins shall be <br /> fenced with six (6)foot high chain link fence or equal when the maximum design depth is 18 <br /> inches or more. Required retention basin capacity shall be calculated by a registered civil <br /> engineer, licensed contractor or licensed architect prior to release of the building permit for both <br /> phases of the project. Additionally,the Final Site Plan shall show the on-site drainage pattern. <br /> (Development Title Section 9-1135) <br /> f. The Traffic Impact Mitigation Fee shall be required for both phases of the project. The fee is due <br /> and payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> g. The Regional Transportation Impact Fee shall be required for both phases of the project. The fee <br /> is due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> h. A copy of the Final Site Plan shall be submitted prior to release of building pemnit for both phases <br /> of the project. <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> j. Permit Registration Documents (PRD's) shall be filed with the State Water Resources Control <br /> Board (SWRCB). Waste Discharge Identification (WDID) Number issued by SWRCB shall be <br /> submitted to the Department of Public Works for file. Contact SWRCB at(916) 341-5537 for <br /> further information. Coverage under the SWRCB General Construction Permit Order 2009-0009- <br /> DWQ shall be maintained throughout the duration of all phases of the project. <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control <br /> District (209-982-4675) and the California Health and Safety Code forthe prevention of <br /> mosquitoes. Best Management Practices (BMP)guidelines for stormwater devices, ponds and <br /> wetlands are available. <br /> Conditions of Approval -4- <br />