Laserfiche WebLink
TABLE OF CONTENTS (Continued) <br /> 4.11-9 Bicycle and Pedestrian Circulation.....................................................................................................4.11-31 <br /> 4.11-10a 2025 Buildout With-Project(without Interstate 2051ammets Interchange)Turning-Movement <br /> Volumes..................................................................................................................................................................4.11 42 <br /> 4.11-1 Ob 2025 Buildout With-Project(without Interstate 205/1-arnmers Interchange)Turning-Movement <br /> Volumes..................................................................................................................................................................4.11 43 <br /> 4.11-11a 2025 Buildout With-Project(with Interstate 205/1,ammers Interchange)Tuming-Movement Volumes...4.11-44 <br /> 4.11-11b 2025 Buildout With-Project(with Interstate 205/Larnmers Interchange)Turning-Movement Volumes...4.11-45 <br /> 4.11-12a 2025 Buildout With-Project(without Interstate 205/1ammers Interchange)Lane Configurations.............4.11-49 <br /> 4.11-12b 2025 Buildout With-Project(without Interstate 205/I immers Interchange)Lane Configurations.............4.11-50 <br /> 4.11-13 2025 Buildout With-Project Lane Configuration and Signal Requirements......................................................4.11-54 <br /> 4.13-1 Common Noise Sources and Levels......................................................................................................4.13-2 <br /> 4.13-2 Sensitive Receptors and Ambient Noise Measurement Locations........................................................4.13-5 _ <br /> 4.14-1 Viewpoint Locations.............................................................................................................................4.14-2 <br /> 4.14-2 Existing Viewpoints(Nos. 1 and 2)......................................................................................................4.144 <br /> 4.14-3 Existing Viewpoints(No. 3)..................................................................................................................4.14-5 <br /> 4.144 Existing Viewpoints(Nos.4a,4b, and 4c)............................................................................................4.14-7 <br /> 5-1 Traffic/Air Emissions Reduction Alternative...........................................................................................5-17 <br /> Tables Page <br /> 2-1 Summary of Impacts and Mitigation Measures ........................................................................................2-7 <br /> 3-1 Summary Comparison--Buildout(2025)Under Proposed Project vs.MHMP......................................3-17 <br /> 3-2 Proposed College Park Land Uses at Buildout(2025).............................................................................3-18 <br /> 3-3 Mountain House Master Plan(MHMP)Land Uses at Buildout(2025)...................................................3-19 <br /> 3-4 Development Table for Tentative Subdivision Maps(GNK,LLC and InvestWest Matthews <br /> Land,Inc.Parcels)....................................................................................................................................3-30 <br /> 3-5 Delta College Phasing..............................................................................................................................3-45 <br /> 4.4-1 Students Generation..............................................................................................................................4.4-20 <br /> 4.5-1 Projected Water Demands.....................................................................................................................4.5-32 <br /> 4.6-1 Cultural Resource Studies Conducted in the Vicinity of College Park Site............................................4.6-3 <br /> 4.6-2 Cultural Resources Located in College Park and Off-Site Improvement Areas.....................................4.6-4 <br /> 4.6-3 Existing Buildings/Structures on College Park Site of 50+Years of Age............................................4.6-13 <br /> 4.7-1 College Park Stormwater Runoff Quantities...........................................................................................4.7-3 — <br /> 4.7-2 College Park Existing/Future Stormwater Runoff Quantities...............................................................4.7-15 <br /> 4.8-1 Comparison of Average Concentrations of Inorganic Salts at Delta Locations......................................4.8-2 _ <br /> 4.8-2 Estimated 24-hour, 100-Year Stormwater Runoff Volume on the College Park Site and <br /> Contributing Watershed under Existing and Developed Conditions....................................................4.8-10 <br /> 4.8-3 Mean Constituent Concentrations for Land Use Categories.................................................................4.8-11 <br /> 4.84 Percentage Cover of Proposed Land Uses on the College Park Site.....................................................4.8-12 <br /> 4.8-5 Summary of Constituent Loading Analysis for the College Park Site..................................................4.8-13 <br /> EDAW College Park at Mountain House Specfic Plan III Draft EIR <br /> Table of Contents iv San Joaquin County <br />