Laserfiche WebLink
TABLE OF CONTENTS(Continued) <br /> 4.13-12 Predicted I-205 Traffic Noise Levels with College Park Buildout in 2025........................................4.13-27 <br /> 5-1 Alternatives—Development Table.............................................................................................................5-3 <br /> 5-2 College Park Project—Summary of Impacts.............................................................................................5-4 <br /> 5-3 Water Demand and Wastewater Generation—MHMP Buildout Alternative vs.Proposed Projects-........11 <br /> 54 Trip Reduction Measures under Traffic/Air Emissions Reduction Alternative.......................................5-18 <br /> 5-5 Water Demand and Wastewater Generation—Traffic/Air Emissions Reduction Alternative vs. <br /> ProposedProject.......................................................................................................................................5-20 <br /> 5-6 Trip Generation—Traffic/Air Emissions Reduction Alternative(Not Including Trip Reduction from <br /> TransitProgram) ......................................................................................................................................5-23 r <br /> 5-7 Trip Generation—Proposed Project.........................................................................................................5-23 <br /> 5-8 Comparison of Impacts of the Proposed Project to Those of the Alternatives.........................................5-27 <br /> 6-1 List of Key Past Projects............................................................................................................................6-2 <br /> 6-2 List of Key Present and Reasonably Foreseeable Future Projects.............................................................6-3 <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Table of Contents vi San Joaquin County <br />