My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
primary residential uses being proposed,a minimum of 196 second units shall be developed in addition to the <br /> primary units.It is anticipated that 33%of the second units would be rented to lower income households(per <br /> MHMP Policy 3.9.3(a)(4) and Table 3-9 of the MHMP). <br /> r 3.8.2 COMMERCIAL COMPONENT <br /> The commercial component would include 1.5 acres of neighborhood commercial uses and 16.8 acres(256,130 <br /> ` square feet)of office commercial uses. As indicated in Figure 3-6B,the neighborhood commercial uses would be <br /> developed within Neighborhoods A/B near the two proposed K-8 schools and the surrounding proposed <br /> residential development;the office commercial uses would be developed between DeAnza Boulevard and <br /> Mountain House Parkway, south of Grant Line Road.The neighborhood commercial and office commercial uses <br /> that would be permitted under the College Park project are listed in section 3.7.2,"Development Title <br /> Amendments." Some of these uses require special approvals, such as improvement plan approval, site plan <br /> approval,and/or conditional use pemvt approval. <br /> 3.8.3 LIMITED INDUSTRIAL COMPONENT <br /> �^ The limited industrial(I/L)component would include the development of 86.5 acres(1,507,260 square feet)of <br /> limited industrial uses.As indicated in Figure 3-6B,this component would be developed in Neighborhoods A/B <br /> (within the southern part of the project site along I-205)and in Neighborhoods AB and D(within the eastern <br /> �. portion of the site between DeAnza Boulevard and Mountain House Parkway).The limited industrial uses that <br /> would be permitted under the College Park project are listed in section 3.7.2,"Development Title Amendments." <br /> Some of these uses require special approvals,such as improvement plan approval,site plan approval,and/or <br /> conditional use permit approval. <br /> 3.8.4 SCHOOLS COMPONENT <br /> ELEMENTARY SCHOOLS <br /> The project site is provided K-8 school service by the Lammersville Elementary School District(LESD). <br /> In accordance with the MHMP,each neighborhood to be developed within the College Park site under the <br /> proposed project would be served by a K-8 school(Figure 3-6B).Neighborhoods A/B would be served by two <br /> new K-8 schools proposed under the proposed project(Schools A and B). The College Park portion of <br /> Neighborhood D would be served by one new K-8 school planned in the Specific Plan II portion of <br /> Neighborhood D by the MHMP. In all,the project would generate an estimated 1,487 K-8 school children and <br /> 385 high school children. <br /> Both school sites A and B would incorporate approximately 16 acres and would be located immediately adjacent <br /> to park facilities.The project incorporates the eastern portion of Neighborhood D while SP I area incorporates the <br /> western portion of Neighborhood D. A K-8 school located in the SP I area would temporarily provide public <br /> school services to the whole Neighborhood D area.Until the two K-8 schools are constructed in the project area <br /> _ and the K-8 school in SP I area serves Neighborhood D,the K-8 students would be bussed to elementary schools <br /> in the SP I project area. <br /> The College Park project would provide for a condition in which the vast majority of residences in <br /> Neighborhoods AB(86%)would be located within the Central Parkway loop.This would allow for the students <br /> associated with these residences to access the schools without crossing an arterial.The balance of the residences <br /> in Neighborhoods AB(14%)would be located outside the Central Parkway loop. To avoid the need for these <br /> students to cross Central Parkway,these K-8 students would be bussed to School(s)A and/or B on permanent bus <br /> service for the remaining students to comply with Policy 3.4 of the MHMP requiring a safe pedestrian access to <br /> K-8 students.The SJDCCD would make a contribution to the transportation program developed by LESD. <br /> College Park at Mountain House Spee'rfic Plan III Draft EIR EDAW <br /> San Joaquin County 3.21 Project Description <br />
The URL can be used to link to this page
Your browser does not support the video tag.