Laserfiche WebLink
Implementation 15.3(c).Each segment of the storm drainage system shall be designed as needed to provide <br /> protection for each phase of development. <br /> Storm Drainage and Flood Protection(Section 15.4) <br /> ► Policy 15.4(a).Pipes and/or open channels shall be designed with 100-year flood capacity to a point of <br /> terminal discharge. <br /> Policy 15.4(b).Open-channels shall be designed to minimize erosion. <br /> ► Policy 15.4(c). Sediment generated by grading or construction activities shall be subject to BMPs before <br /> discharge to creeks,ditches, and Old River. _ <br /> Policy 15.4(d).Trunk line pipes(72-inch and larger), detention basins, and major open channels shall be <br /> designed and constructed to transport the 100-year volumetric flow rate. <br /> Policy 15.4(e).Trunk-line pipes shall be designed for gravity-flow conditions. <br /> ► Policy 15.40. Open-channels shall be designed and constructed to meet the most conservative freeboard <br /> requirements of federal, state,or county standards. <br /> ► Policy 15.4(g).Erosion shall be minimized by designing and constructing open channels to convey storm- <br /> water runoff at or below the allowable maximum velocity. <br /> ► Policy 15.4(1).The ultimate point of terminal discharge for all drainage shall be Old River.Future flows shall _ <br /> be metered to pre-development rates. <br /> Mountain House Creek Improvements(Section 15.6) <br /> ► Policy 15.6(d).Mountain House Creek shall be designed to minimize erosion. <br /> Phasing and Costs(Section 15.11) — <br /> ► Section 15.11.2 (Operations and Maintenance). Storm-drainage and flood-protection facilities will be <br /> maintained by the MHCSD. A channel-maintenance plan shall be prepared before the submittal of the first <br /> development permit and shall include a program to monitor sedimentation buildout for Mountain House <br /> Creek and drainage channels. Maintenance costs have been incorporated in the fiscal analysis presented in the <br /> PFP. <br /> Final EIR for the Mountain House Master Plan and Specific Plan 1 1994 (Mitigation Measures) <br /> The following drainage mitigation measures from the Final EIR for the Mountain House Master Plan and Specific <br /> Plan I are applicable to the proposed project. <br /> ► Mitigation Measure 4.74(Preliminary Soils Report).The soils report required for each subdivision shall <br /> identify the seasonal high groundwater level at the site of any detention/retention basins proposed as part of the <br /> stormwater management system.The report shall provide recommendations for appropriate design elevations <br /> for the detention/retention basins that would avoid saturation or partial filling by groundwater.The report shall - <br /> specifically address the potential for increased groundwater levels caused by removal or disruption of existing <br /> subsurface drains.The report will provide recommendations for subsurface drains for all newly constructed <br /> structures or facilities.These recommendations shall include provisions for routing and disposal of drain <br /> discharges that will not result in adverse flooding or saturation hazards in other areas of the project site. <br /> EDAW College Park at Mountain House Speedic Plan III Draft EIR <br /> Drainage 4.7-8 San Joaquin County <br />