Laserfiche WebLink
(b)Industrial or commercial operations at the project site with equipment that causes or has a potential for air <br /> pollution,or that controls such air pollution,may need to apply for an Authority to Construct and Permit <br /> to Operate, according to SJVAPCD regulations. <br /> (c)Fireplaces. Each single-family residence shall have no more than one zero-clearance fireplace or <br /> -- freestanding wood stove. <br /> Mitigation Measure M4.13-5. (a)Transport of Materials. All material transported off-site shall be either <br /> .. sufficiently watered or securely covered to prevent excessive amounts of dust. <br /> (b)Equipment Maintenance. All internal-combustion-engine driven equipment shall be properly maintained <br /> and well tuned according to the manufacturer's specifications. <br /> College Park at Mountain House Specific Plan 111 2004 <br /> • Implementation Measures. Transportation Management <br /> • Telecommuting shall be promoted to reduce automobile trips. <br /> • The MHCSD shall provide free transit service to new residents of the Mountain House community for the <br /> first three months of occupancy. <br /> • Vehicle miles traveled is expected to be achieved through community design to reduce internal trip <br /> lengths and create a jobs/housing balance to reduce external trips <br /> • The project shall incorporate facilities to support and offer connections to alternative transportation <br /> modes, including walking,bicycling,and transit. <br /> • The project shall be subject to all requirements of the SJVUAPCD,MHCSD Standards and Programs, <br /> including the MHCSD's TDM Plan and Construction Truck Management Plan. <br /> ._ The offering by employers in Specific Plan III employment areas of alternative work weeks, such as four <br /> 10-hour days or nine 9-hour days in a 2-week period, should be encouraged to reduce vehicle trips. <br /> Implementation Measures. Cleaner Fuels <br /> • Parking facilities throughout the community shall provide preferential parking for cleaner fuel vehicles <br /> and all school and transit vehicles as established in the MHCSD TDM Program. <br /> • Implementation Measures. Construction Program for Air Quality <br /> • Generation of dust and emissions shall be controlled during the pre-construction and construction phases <br /> to meet all SJVAPCD requirements. <br /> • Construction practices shall comply with:Regulation VIII Control Measures of the SJVAPCD and <br /> applicable measures in Table 6-3 of the SJVAPCD Guide for Assessing and Mitigating Air Quality <br /> Impacts,January 10, 2002. <br /> Implementation Measures.Houses and Buildings <br /> The following shall be required as conditions of tentative map approval: <br /> • Natural gas line outlets shall be provided to backyards to encourage usage of natural gas barbecues. <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.12-17 Air Quality <br />