Laserfiche WebLink
� M <br /> i <br /> v <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> PBa <br /> itigation Measure Implementation Intpfementation&Verification <br /> Timing/Schedule <br /> Responsibility Action Dates <br /> Qable of independent survival, the Completed <br /> r;o can be destroyed. <br /> 0 urces--Conversion of Common Before and during SJCOG, in <br /> r Habitat and Possible Loss ofconstruction consultation with DFG <br /> < The College Park developers shall request <br /> coverage under the SJMSCP, and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park, Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site, but are <br /> CO concentrated along Grant Eine Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> on fallow fields. During the SJMSCP application <br /> process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> habitat. If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site, the <br /> SJMSCP incidental take avoidance and <br /> 0 <br /> minimization measures described below for <br /> nesting raptors shall be implemented. Additional <br /> 7. measures below shall be implemented to avoid <br /> _r loss of active nests of common raptor species, �v <br /> v c which are not covered under the SJMSCP but are <br /> protected under the California Fish and Game <br /> Code,The project applicants shall retain <br /> CD <br /> cqualified biologists to conduct all pre- <br /> construction surveys. <br /> 0 iu < White-tailed Kite. If project construction begins <br /> during the nesting season(February 15— <br /> September IS),pre-construction surveys shall be <br />