My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006529
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
19530
>
2600 - Land Use Program
>
PA-0700093
>
SU0006529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:29 AM
Creation date
9/5/2019 10:46:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006529
PE
2611
FACILITY_NAME
PA-0700093
STREET_NUMBER
19530
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
APN
20907023
ENTERED_DATE
4/18/2007 12:00:00 AM
SITE_LOCATION
19530 W GRANT LINE RD
RECEIVED_DATE
4/18/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\APPL.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\CDD OK.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\EH COND.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cf) n <br /> m o <br /> � T <br /> � <br /> College Park at Mountain House Specific Plan III <br /> W Mitigation Monitoring and Reporting Program <br /> R-, ... -..- .. :._. . .. _. <br /> o..W, Implementation Implementation&VerifcatGon -- <br /> o Mitigation Measure Timing/Schedule Responsibility Action Comalsted <br /> p <br /> conducted to investigate all potential nesting <br /> = trees on the project site(e.g., especially tree-tops <br /> N15-59 feet above the ground in oak, willow, <br /> CD eucalyptus,cottonwood,or other deciduous <br /> trees), whenever white-tailed kites are noted on- <br /> CD site or within the vicinity of the site during the <br /> nesting season.A setback of 104 feet from white- <br /> tailed kite nesting areas shall be established and . <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> CO <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project,construction begins <br /> during the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> o' <br /> during the nesting season in suitable nesting <br /> 3 habitat within 500 feet of areas of project <br /> o activity.The survey shall be conducted within <br /> E; <br /> E. the Z weeks before construction begins. A <br /> �}. <br /> � setback of 500 feet from northern harrier nesting <br /> areas shall be established and maintained during <br /> m <br /> Q the nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> o leave nests. This setback applies whenever <br /> a construction or other ground-disturbing activities <br /> c4 must begin during the nesting season in the <br /> oM presence of nests that are known to be occupied. <br /> Setbacks shall be marked by brightly colored <br /> 3 temporary fencing. <br /> < Common Raptors.If project construction begins <br />
The URL can be used to link to this page
Your browser does not support the video tag.