Laserfiche WebLink
3: m <br /> '- a <br /> n <br /> o' <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date. <br /> �. responsibility Action <br /> Completed <br /> n� <br /> CL are capable of independent survival,the <br /> X burrow can be destroyed. <br /> 0 4.10-6 Biological Resources—Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> 0 < The College Park developers shall request . <br /> coverage under the SJMSCP, and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park. Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site, but are <br /> CO concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields. During the SJMSCP application <br /> o process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> habitat. If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site, the <br /> SJMSCP incidental take avoidance and <br /> o minimization measures described below for <br /> C nesting raptors shall be implemented. Additional <br /> v measures below shall be implemented to avoid <br /> = loss of active nests of common raptor species, <br /> W = which are not covered under the SJMSCP but are <br /> z cr protected under the California Fish and Game <br /> r__ <br /> -0 Code. The project applicants shall retain <br /> CD <br /> qualified biologists to conduct all pre- <br /> F, constriction surveys. <br /> < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15– <br /> September 15), pre-construction surveys shall be <br />