Laserfiche WebLink
Cn 0 <br /> v o <br /> CD <br /> s <br /> CD College Park at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> Implementation Implementation,&Verification, <br /> Mitigation Measure 7iminglSchedule Date <br /> Z Responsibility Action <br /> Completed <br /> conducted to investigate all potential nesting <br /> a trees on the project site(e.g., especially tree-tops <br /> 15-59 feet above the ground in oak,willow, <br /> `D eucalyptus,cottonwood,or other deciduous <br /> 00 <br /> trees),whenever white-tailed kites are noted on- <br /> CD <br /> nsite or within the vicinity of the site during the <br /> nesting season. A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> iD ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15—August <br /> m' 31),pre-construction surveys shall be conducted <br /> a during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity.The survey shall be conducted within <br /> othe 2 weeks before construction begins. A <br /> setback of 500 feet from northern harrier nesting <br /> m areas shall be established and maintained during <br /> a the nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> o leave nests.This setback applies whenever <br /> 7 construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> o m presence of nests that are known to be occupied. <br /> `n a Setbacks shall be marked by brightly colored <br /> E3 n <br /> temporary fencing. <br /> < Common Raptors.If project construction begins <br />