Laserfiche WebLink
_i <br /> "Second unit dwellings shall be required on at least_lots consistent with the preliminary <br /> second unit plan approved with the tentative mala and Chapter 9-830M of the San Joaquin <br /> County Development Title. The location of an approved second unit may be amended by <br /> Community Development Department only by designation of a replacement lot to receive <br /> the second unit. All replacement parcels must be located within Specific Plan III. Parcels <br /> foreach residential subdivision shall be consistent with the preliminary second unit plan <br /> approved with the Tentative Map." <br /> Timing: Condition shall be met prior to recordation of each Final Map. <br /> 8. Landscape Buffer and Agricultural Fence: A landscape buffer of at least eight feet wide and <br /> an agricultural fence shall be provided adjacent to the existing abutting parcels that are included <br /> as part of Grant Line Village. tSpeciflc Plan III, Implementation Measures 3.2.3.3 (c)and (e).j <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to'Final Map approval. <br /> 9. Agricultural Setback: To the extent feasible, developers shall provide or secure a setback <br /> from development to existing agricultural operations of at least 100 feet. Occupancy permits <br /> shall not be issued for lots with less than a 40-foot setback,from agricultural operations existing <br /> within a 12-month period prior to the time of final map approval. An exception to the . <br /> requirement fora setback may be granted when the owner of such agricultural land has <br /> indicated in writing that the land will no longer be used for agricultural production. <br /> [Implementation Measure 3.2.4.3 (d)] <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval, <br /> 10. Site Furnishings: Site furnishings shall be installed along all streets in accordance with <br /> Implementation Measure 4.2.6.3. All furnishings are subject to design review approval. <br /> Timing: Reflected on Improvement Plans to be reviewed and approved by CDD and MHCSD <br /> and constructed prior to Final Map approval. <br /> 11. Pedestrian Pathways: Final Maps shall maintain, as proposed, all feasible pedestrian <br /> connections. In instances where the proposed location of a through-block connection is <br /> determined by the Community Development Director to be in conflict with the health, safety and <br /> welfare of community residents, such connection may be eliminated. <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval. <br /> 12. Bicycle and Pedestrian System: Final Maps shall conform to the bicycle and pedestrian <br /> system depicted in Specific Plan III Figure 9.7. <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval. <br /> 13. Roadways and Transit: Final Maps shall conform to the roadway system depicted in Specific <br /> Plan III Figure 9.6 for arterials and collectors, and to the transit system depicted in Specific Plan <br /> III Figure 9.8. <br /> Timing: Improvement plans approved by CDD and MHCSD prior to Final Map approval. <br /> 14. Public Area Landscaping and Architecture:The applicant shall submit landscape <br /> improvement plans for the Tentative Map. Landscaping and architectural design of public <br /> areas shall implement the common design theme for the neighborhood and shall be consistent <br /> with the MHCSD Design Manual, Roadway Landscape Plans, and/or other applicable <br /> neighborhood design criteria. [SPIII Implementation Measure 4.2.4.3] <br /> Timing: Improvement Plans, Building Permits. <br /> 5 <br />