Laserfiche WebLink
coo <br /> � o <br /> N College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> -5 RLImplementation&Verification <br /> o Implementation <br /> c g Mitigation Measure Timing/Schedule Date <br /> g Responsibility Action Completed <br /> conducted to investigate all potential nesting <br /> o trees on the project site(e.g., especially tree-tops <br /> N 15-59 feet above the ground in oak, willow, <br /> eucalyptus,cottonwood,or other deciduous <br /> $ti trees), whenever white-tailed kites are noted on- <br /> site or within the vicinity of the site during the <br /> nesting season, A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests, This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied, Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier. If project construction begins <br /> during the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity. The survey shall be conducted within <br /> the 2 weeks before construction begins.A <br /> setback of 500 feet from northern harrier nesting <br /> d <br /> areas shall be established and maintained during <br /> a the nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> CD <br /> -$ leave nests. This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> om presence of nests that are known to be occupied. <br /> Setbacks shall be marked by brightly colored <br /> 3 temporary fencing. <br /> < Common Raptors.If project construction begins <br />