Laserfiche WebLink
Mm <br /> o <br /> �'. College Park at Mountain House Specific Plan HH <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation Implementation&Verification <br /> �. Mitigation Measure 7iminglSct�edlrle Responsibility Date <br /> Action p <br /> n ► Mobile-Source TAC Emissions----The College Com leted <br /> Park applicants for industrial or commercial land <br /> uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> omethodologies that may become available to <br /> estimate the risk. The developers shall implement <br /> any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions, <br /> 4,12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD, in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College.Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> Is4,12-5 Air Quality--Increased Long-'Term Regional Before construction SJVAPCD,in <br /> Emissions of Criteria Pollutants begins and <br /> during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> © Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> are already included in the proposed project design <br /> m <br /> and/or are already required by the MHMP and by <br /> mitigation in the MHMP and Delta College EIRs. <br /> � m <br /> X? <br /> � n <br /> O <br /> c � <br /> �.�'.� A�'�IS ��r� wr� <br /> ..._,. .i �� �r..rri f �.�+� ��, N+�y r�--�•�l <br /> '1 ! c <br />