Laserfiche WebLink
c� c7 <br /> W p <br /> 3 <br /> C College Park at Mountain House.specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Irn lementation&verification <br /> 7 Mitigation Measure Timing/Schedule Implementation p <br /> Responsibility Action nate <br /> P <br /> 4.13. NOISE Con feted <br /> = 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> a <br /> ro Noise conjunction with the. <br /> 0 < Limit project construction activities to the hours developer <br /> n between 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> ?a Development Title for all construction activities, <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> G, recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to min mize travel adjacent to occupied <br /> residences. _ <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> — receptors,Temporary acoustic barriers may be <br /> installed around stationary equipment,if <br /> a necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase S'CCDD,in <br /> Noise and during conjunction with the <br /> The project applicants shall incorporate the measures cohstruetion developer <br /> d <br /> identified below into the project design. <br /> a Commercial,Office,and Industrial Uses <br /> Industrial and commercial land.uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L,4 during daytime hours <br /> (7;00 a.m. to 10:00 p.m.)or 50 dBA L,q during <br /> n nighttime hours(10:00 p.m to 7:00 a.m.)at off-site <br /> B noise-sensitive receptors.In addition,design and <br />