My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E: m <br /> a <br /> o College Park at Mountain House Specific Plan.U <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure TiminglSchedeJle ResponsibilityAction Completed <br /> p <br /> aoperational standards shall be established to minimize <br /> noise generated by loading dock activities from <br /> adversely affecting planned and existing off-site <br /> noise-sensitive land uses.Design and operational <br /> measures may include: <br /> ro <br /> < Enclose outdoor noise-generating equipment <br /> v and/or set back from the property line. <br /> < Locate buildings and structures such that they <br /> shield off-site sensitive receptors from on-site <br /> noise sources, including loading dock activity, <br /> < Enclose loading dock areas <br /> < Limit loading dock activity,including delivery <br /> truck arrivals and departures,to between 7:00 <br /> a.m.and 10:00 p.m at those loading docks with <br /> direct line of site of noise-sensitive receptors <br /> within a distance of 1,000 feet.Activity at all <br /> 4 other loading docks shall be Iimited to the hours <br /> to between 5:00 a.m.and 10:00 p.m. <br /> fD Noise studies,including on-site sound level <br /> v measurements, shall be conducted to ensure that these <br /> thresholds are not exceeded.The noise studies shall <br /> be funded by the College Park developers and <br /> e approved by SJCCDD before construction. <br /> .Landscape Maintenance <br /> The following measures shall apply to noise- <br /> ,, 0 generating activities associated with landscaping and <br /> maintenance of school grounds,neighborhood parks, <br /> o,a community parks,and open space. <br /> CD <br /> < On-site landscape maintenance equipment shall <br /> a' be equipped with properly operating exhaust <br /> c -a mufflers and engine shrouds,in accordance with <br /> w <br /> manufacturers'specifications.For maintenance <br /> '� = areas located within 320 feet of noise-sensitive <br />
The URL can be used to link to this page
Your browser does not support the video tag.