My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002399
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GUERNSEY
>
3250
>
2600 - Land Use Program
>
UP-90-07
>
SU0002399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:13 AM
Creation date
9/5/2019 10:52:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002399
PE
2626
FACILITY_NAME
UP-90-07
STREET_NUMBER
3250
STREET_NAME
GUERNSEY
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
3250 GUERNSEY
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\APPL.PDF \MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\CDD OK.PDF \MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\EH COND.PDF \MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DCMemo <br /> UP-90-7 <br /> 9-27-89 <br /> Page 2 <br /> Site Plan: <br /> If the applicant elects to submit a full application, the <br /> following issues should be addressed in the revised site plan . <br /> 1 . The site plan refers to a future Phase II . It is not clear <br /> as to what Phase II is or whether it is to be included under <br /> this application. If building permits for Phase II can be <br /> obtained within the established 18 month period, it should be <br /> considered with this application. <br /> 2 . One parking space shall be provided for each three seats pro- <br /> vided in the church and two spaces for each three employees. <br /> As such, 79 91x20 ' parking spaces are required. If Phase II <br /> will expand the seating capacity, additional parking would be <br /> required. <br /> 3 . All traffic aisles shall be a minimum of 24 feet in width and <br /> shall be paved. This standard applies to the fire access <br /> drive as well. <br /> 4 . Any proposed outdoor lighting shall be hooded and directed <br /> away from adjacent properties and roadways . <br /> 5 . The proposed trash receptacle shall be solid on three sides <br /> and gated on the fourth. <br /> 6 . The proposed sign shall be a monument sign and shall not <br /> exceed six feet in height. The maximum sign area shall be 24 <br /> square feet. <br /> 7. The extent of the proposed landscaping is not clearly defined <br /> on the submitted site plan. The following standards would be <br /> applied: <br /> a) Parking areas adjacent to the Golden Gate Avenue and <br /> Guernsey Avenue shall be landscaped to at least a depth <br /> of ten feet. The landscaped areas shall include trees <br /> spaced no further than 25 feet apart and may include <br /> mounding, shrubbery, and/or lawn. Planter areas adjacent <br /> to entrance drives or street corners shall not block <br /> visibility. There shall be clear site visibility from <br /> three to six feet for auto traffic at these locations . <br /> b) The southern portion of the project site shall be main- <br /> tained in lawn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.