Laserfiche WebLink
V <br /> 15064.5(e)of Guidelines for California Environmental Quality Act. <br /> Contact: Bill Dubois, <br /> 2. DEPARTMENT 6F PUBLIC WORKS(StDubois, 468-3000} <br /> hvewaY <br /> a. An encroachfnent permit shall fl e required twork forr all workevertical features u d ngf but notern t d t fences, <br /> encroachment permits are for <br /> walls, private%,light standards, rocks l and 91145 5}d cobbles are not allowed in the right-o-way. <br /> (Development Title Sections 9-1 1 <br /> b. Submit for approval turning analysis drawings5 prepared <br /> suffif by <br /> to registered <br /> llow horseltrengineer <br /> nsport vehicles(e.g., <br /> surveyor showing that the proposed driveway onto lanes of traffic. The <br /> semi-truck arad trailer)ingress and egress minimum in general conformance with the requirements of <br /> driveway approach shall be improved <br /> San Joaquin" y Standards R-17 with add <br /> San Tionai width,tle Section 9x1145 5)improvements, and turning <br /> radius as requied by the turning analys <br /> c. Any gates skull be located such that t be opened while <br /> Lanto the gat so that alowint uck clear 5 feet <br /> an <br /> andtrailer can park. <br />� from the edge of pavement on Harney t_a <br /> The Traffic Irieipact Mitigation Fee shall be required forthis�on the cuerretnt schedule The fee shall be <br /> , The fee is due and payable <br /> d' permit application. The fee is ba <br /> at the time of building p PP <br /> automaticailytad}asked July 1 of each year <br /> lutonthe <br /> R 00-433)Engineering Construction Cost Index as published <br /> by the Engineering News Record. (Reso <br /> ,e for this development. The fee is <br /> e. The Regionai,Transportation Impact Fee shall <br /> Thelfee is based an the current schedule�ue and <br /> payable at the time of building permit application, <br /> (Resolution R.-06-38) <br /> a <br /> f. Any work within 14 feet of the land side toe of Bear Creek shalt require a permit from the Centra <br /> Valley Flood'-Protection Board. <br /> red of Pixley Slough shall required a watercourse <br /> g. Any work within 25 feet of the bank hinge p <br /> encroachment permit from San Joaquin County Flood Management. <br /> all be submitted prior to the release of building permits. <br /> h, A copy of theFinal Site Plan sh <br /> +: Solid Waste <br /> this development has <br /> i. Verification shall be obtained from et Plan Format for Development-3066) t Projects. The Ficial Site Plan is <br /> he <br /> met the requl'ements of the W <br /> required upqsubmittal of verification. <br /> and meetthe <br /> irements of San Joaquin County <br /> The developer shall provide drainage facilities releaseurate of storm watery from discharging <br /> Development Standards to prevent the increased rano <br /> ff onto other properties and to prevent o-sial when thsedimene maxpmum design depth is 18hnlch hes more. <br /> with asix-foot-high chain-link fenceq <br /> Required retention basin capacity shall be calculated by a registermits�v(De engineer,, <br /> elopment Title Section <br /> contractor, oe- icensed architect prior to the release of building p <br /> 9-1135) <br /> rt of a larer pan of <br /> ect disturbs less than one fground and is not pa <br /> follow he practices of the County's I <br /> roj acre Small Site <br /> common dev <br /> k. The proposed.p elopment. The propose project shall <br /> Storm Water;Management Plan." <br /> r' <br /> PA Page <br /> San Joaquin County Page 7 <br /> Community Development <br /> r <br /> 'i:i. <br />