Laserfiche WebLink
Conditions, if Approved <br /> Use Permit Application No. UP-98-18 was approved by the Planning Commission on The <br /> effective date of approval is . This approval will expire on , which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force,and (3) all necessary permits from <br /> other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Jeff Fisher,468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage,driveway access details(including gates), on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a 400-person farm labor camp, as shown on the Plan dated <br /> September 17, 2001 and described in the application attachment by Aubrey Moore Architects dated <br /> September 24, 2001. (Use Type: Farm Labor Camp) <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section 7-1000 of the County Ordinance Code) <br /> d. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust-free surface. Bumper guards shall be provided where <br /> necessary to protect adjacent structures or properties.(Development Title Section 9-1015.5[e]) <br /> (2) A minimum of 142 parking spaces shall be provided, including five (5) handicapped accessible <br /> spaces, one of which shall be van accessible. Accessible spaces shall be located as close as <br /> possible to the primary entrance(C.C.R., Title 24). (.33 spaces are required for every bed; one <br /> (1)space is required for every employee.) (Development Title Section 9-1015.3) <br /> f. LIGHTING: Lighting shall be provided and comply with the following: <br /> (1) If the parking area is to be used at night, parking lot and security lighting shall be installed. <br /> (Development Title Section 9-1015.5[g]) <br /> San Joaquin County UP-98-181Rios <br /> Community Development Page 6 <br />