My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002474
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17900
>
2600 - Land Use Program
>
UP-89-02
>
SU0002474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 5:55:05 PM
Creation date
9/5/2019 11:00:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002474
PE
2626
FACILITY_NAME
UP-89-02
STREET_NUMBER
17900
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
17900 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\H\HARNEY\17900\UP-89-02_GP-89-8\SU0002474\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH COUNTY SANITARY LANDFILL <br /> UP-89-2 <br /> PROPOSED CONDITIONS OF APPROVAL <br /> 1 . A wetland restoration plan, including a description of existing <br /> conditions , a grading plan, a planting plan, a maintenance <br /> plan and a monitoring plan shall be prepared and submitted <br /> to the Planning Division for approval prior to final landfill <br /> design. Said plan shall result in no net loss of wetland values <br /> or acreage, and shall be acceptable to the State Department of <br /> Fish and Game. <br /> 2. A survey of the vernal pools shall be conducted by qualified <br /> personnel in the spring (April or June) to determine if <br /> special-status plant species are present. Results shall be <br /> submitted to the Planning Division for review. If special-status <br /> plants are identified, a mitigation plan acceptable to the <br /> State Department of Fish and Game shall be prepared. <br /> 3 . A replacement willow grove shall be planted along the rerouted <br /> South Paddy Creek. Planting details shall be included in the <br /> wetland restoration plan. <br /> 4 . Perimeter drainage ditches with wide, shallow profiles and a <br /> gentle gradient shall be constructed and planted with grasses. <br /> Such ditches shall be indicated on the improvement plans . <br /> 5 . Silt fences shall be installed at all points where storm water <br /> drainage leaves the project site. Silt fence locations and <br /> construction details shall be shown on the improvement plans. <br /> 6 . Temporary storm drainage sumps shall be constructed within <br /> active landfill modules to control sediment. Construction <br /> details shall be shown on the improvement plans. <br /> 7 . Completed landfill modules shall be revegetated upon placement <br /> of final cover and not later than October 15th each year. <br /> 8 . Landfill operations shall be limited to daylight hours. <br />
The URL can be used to link to this page
Your browser does not support the video tag.