Laserfiche WebLink
Conditions of Approval <br /> SA-92-4 <br /> Page 6 <br /> approval. As an option the Department of Public Works <br /> will prepare the drawing and estimate for an additional <br /> fee of $100. 00. ) (Planning Title Section 9-2143) <br /> f. Storm drainage for the development shall be provided by <br /> either: <br /> 1. Dedication of land, if needed, to expand community <br /> detention pond for Grant Industrial Park and <br /> expansion of the pond volume by the amount required <br /> by County Standards for this development. <br /> or <br /> 2 . Construction of terminal drainage facilities shall <br /> be consistent with the storm drain Master Plan <br /> system 9H. a permit from the State Reclamation <br /> Board shall be required for work in the Calaveras <br /> River. <br /> Dedication of appropriate pipeline easements for <br /> System 9H will be required in both A and B <br /> alternates. either A or B Storm Drainage System <br /> shall be completed within 18 months of approval of <br /> the Site Approval application. (Planning Title <br /> Section 9-10300) <br /> g. Street lighting shall be provided for the development <br /> along the frontage of Wilcox Road. (Planning Title <br /> Section 9-9301) <br /> h. The property shall annex to County Service Area No. 17 <br /> prior to approval of the Improvement Plan to provide for <br /> the operation, maintenance, and improvement of storm <br /> drainage, street lighting facilities. (Planning Title <br /> Section 9-10003) <br /> i. Access to Hubbard Road shall not be allowed. <br /> 3. PUBLIC HEALTH SERVICES: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements cannot be modified. <br /> a. The existing sewage disposal areas must be barricaded so <br /> it cannot be driven over, parked on, or used as a storage <br /> area. <br />