Laserfiche WebLink
Conditions of Approval <br /> SA-92-4 <br /> Page 7 <br /> b. The lid on the existing septic tank next to building "B" , <br /> olive processing, must be repaired. <br /> C. The wash down water from building "B" must be properly <br /> handled. The water cannot be put into the sewage <br /> disposal system and it cannot just drain to the ground <br /> surface next to the foundation. <br /> d. Should the number of non-resident individuals exceed 24 <br /> for at least 60 days per year, or the number of service <br /> connections exceed four, a yearly permit to operate a <br /> public water system under the provisions of Title 22 , <br /> CCR, will be required by the Environmental Health <br /> Division. <br /> e. If floor drains are required, they must be plumbed <br /> through a sand/oil separator and discharged to an above <br /> ground system approved by the Environmental Health <br /> Division. This system must be designed by a Registered <br /> Engineer. Applicant must file an application for <br /> facility permit/waste discharge with the Central Valley <br /> Regional Water Quality Control Board. The application <br /> forms can be obtained from the Environmental Health <br /> Division. If the above ground holding facility had to be <br /> emptied you first would have to analyze the contents for <br /> any hazardous material. You can obtain specific test <br /> requirements from the Environmental Health Division. <br /> 4 . BUILDING INSPECTION DIVISION: <br /> a. The following Uniform Building Code and San Joaquin <br /> Ordinance requirements will be applicable and shall be <br /> incorporated in the construction plans before submittal <br /> to the Building Inspection Division: <br /> 1. Exterior walls less than 20 ' from a property line <br /> shall be of one-hour, fire resistive construction. <br /> 2 . The proposed building shall be provided with an <br /> automatic fire sprinkler system or divided into <br /> areas less than 6, 000 square feet by area <br /> separation walls. <br /> 3 . The proposed uses will change the occupancy from M- <br /> 3 occupancy, Agricultural Building, to a B-2/H-4 <br /> occupancy, Office, Warehouse and Repair Shop <br />