Laserfiche WebLink
' <br /> U IN <br /> ������ �� ��� � D| <br /> EUGENE DELUCCHI <br /> DEPARTMENT OF PUBLIC WORKS, CHIEF DEPUTY DIRECTOR <br /> R 0.BOX 1010-1610 E.HA7Ei_TO(1I AVENUE <br /> THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95 7'1) DEPUTY DIRECTOR <br /> (209)468-3000 <br /> HENRY M. H|RA7A <br /> n/ <br /> c <br /> DIRE TOR D"� �R <br /> September 18' 1991 / / /On1 <br /> M_O_M_0_8_&_N_D^O_M � k/. <br /> TO : <br /> T0 ; Tbomao M. Qan/ Senior Civil Engineer <br /> Community Development Department <br /> FROM : Charles Kelley , Senior CivilEngin <br /> Public Services Division <br /> SUBJECT : S&-92-4 to permit storage and distribution of railroad <br /> materials Including steel rail / wood ties, and accessories. <br /> "Build to suit" industrial buildings . Located on the N. end of <br /> Wilcox Road, N. of Cherokee Road/ E. of State Route 99, 08 . of <br /> Stockton. <br /> APPLICANT : & Q K 8R Materials 8P0; 087-051-14 <br /> INFORMATION: <br /> The site is located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. The 100-Yeac Flood <br /> Depth will be approximately 1 foot above natural ground <br /> elevation. <br /> Hubbard Avenue has an existing right-of-way width of 60 feet' and <br /> a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS : <br /> 1 ^ An Improvement Plan, prepared by a registered Civil <br /> Engineer, showing drainage , driveway access details, on-site <br /> parking, existing and proposed utility services, and grading, <br /> shall be submitted to the Department of Public Rnchm for <br /> approval . (Planning Title Section 9-10002 ) <br /> 2 ^ All road improvements shall be in conformance with the <br /> Improvement Standards and Specifications of the County of Sao <br /> Joaquin. All improvement plans and specification moot be <br /> approved by the County of San Joaquin Department of Public <br /> Works . (Planning Title Section 9~9135 ) <br /> 3 , The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is doe and payable at <br /> the time of building permit application. (The fee currently <br /> are $208°00 per 1 ,000 gross square foot of building as <br /> "Office" , $207 ^00 per 1 ,000 gross square foot of building as <br /> "Retail Service" or "Service Commercial , , and $83 ,00 per <br /> 1 , 000 gcnoo square foot of Building as "Warehouse" or <br /> "Manufacturing" . If there is no building permit required, <br /> the fee will be exempt . The fee shall be automatically <br /> increased on January 1 of each year at the rate of 6 ,9 <br /> percent. An additional 3 ~5 percent shall be added to the fee <br /> upon payment for processing and administering the program. <br /> (Resolution R~91~327 ) <br />